Set Default ip6tables Policy for Incoming Packets

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

To set the default policy to DROP (instead of ACCEPT) for the built-in INPUT chain which processes incoming packets, add or correct the following line in /etc/sysconfig/ip6tables:

:INPUT DROP [0:0]

If changes were required, reload the ip6tables rules:

$ sudo service ip6tables reload

Rationale

In ip6tables, the default policy is applied only after all the applicable rules in the table are examined for a match. Setting the default policy to DROP implements proper design for a firewall, i.e. any packets which are not explicitly permitted should not be accepted.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if ( ! ( dpkg-query --show --showformat='${db:Status-Status}\n' 'nftables' 2>/dev/null | grep -q installed ) && ! ( dpkg-query --show --showformat='${db:Status-Status}\n' 'ufw' 2>/dev/null | grep -q installed ) && dpkg-query --show --showformat='${db:Status-Status}\n' 'iptables' 2>/dev/null | grep -q installed ); then

sed -i 's/^:INPUT ACCEPT.*/:INPUT DROP [0:0]/g' /etc/sysconfig/ip6tables

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers