Ensure ufw Default Deny Firewall Policy

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

A default deny policy on connections ensures that any unconfigured network usage will be rejected. Note: Any port or protocol without a explicit allow before the default deny will be blocked.

Rationale

With a default accept policy the firewall will accept any packet that is not configured to be denied. It is easier to allow acceptable usage than to block unacceptable usage.

Warning

Changing firewall settings while connected over network can result in being locked out of the system.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers