Enable Kernel Parameter to Use Reverse Path Filtering on all IPv4 Interfaces

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

To set the runtime status of the net.ipv4.conf.all.rp_filter kernel parameter, run the following command:

$ sudo sysctl -w net.ipv4.conf.all.rp_filter=1

To make sure that the setting is persistent, add the following line to a file in the directory /etc/sysctl.d:

net.ipv4.conf.all.rp_filter = 1

Rationale

Enabling reverse path filtering drops packets with source addresses that should not have been able to be received on the interface they were received on. It should not be used on systems which are routers for complicated networks, but is helpful for end hosts and routers serving small networks.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}
' 'kernel' 2>/dev/null | grep -q installed; then

# Comment out any occurrences of net.ipv4.conf.all.rp_filter from /etc/sysctl.d/*.conf files

for f in /etc/sysctl.d/*.conf /run/sysctl.d/*.conf /usr/local/lib/sysctl.d/*.conf; do


  # skip systemd-sysctl symlink (/etc/sysctl.d/99-sysctl.conf -> /etc/sysctl.conf)
  if [[ "$(readlink -f "$f")" == "/etc/sysctl.conf" ]]; then continue; fi

  matching_list=$(grep -P '^(?!#).*[\s]*net.ipv4.conf.all.rp_filter.*$' $f | uniq )
  if ! test -z "$matching_list"; then
    while IFS= read -r entry; do
      escaped_entry=$(sed -e 's|/|\\/|g' <<< "$entry")
      # comment out "net.ipv4.conf.all.rp_filter" matches to preserve user data
      sed -i --follow-symlinks "s/^${escaped_entry}$/# &/g" $f
    done <<< "$matching_list"
  fi
done

#
# Set sysctl config file which to save the desired value
#

SYSCONFIG_FILE="/etc/sysctl.conf"

sysctl_net_ipv4_conf_all_rp_filter_value='1'


#
# Set runtime for net.ipv4.conf.all.rp_filter
#
/sbin/sysctl -q -n -w net.ipv4.conf.all.rp_filter="$sysctl_net_ipv4_conf_all_rp_filter_value"

#
# If net.ipv4.conf.all.rp_filter present in /etc/sysctl.conf, change value to appropriate value
#	else, add "net.ipv4.conf.all.rp_filter = value" to /etc/sysctl.conf
#

# Strip any search characters in the key arg so that the key can be replaced without
# adding any search characters to the config file.
stripped_key=$(sed 's/[\^=\$,;+]*//g' <<< "^net.ipv4.conf.all.rp_filter")

# shellcheck disable=SC2059
printf -v formatted_output "%s = %s" "$stripped_key" "$sysctl_net_ipv4_conf_all_rp_filter_value"

# If the key exists, change it. Otherwise, add it to the config_file.
# We search for the key string followed by a word boundary (matched by \>),
# so if we search for 'setting', 'setting2' won't match.
if LC_ALL=C grep -q -m 1 -i -e "^net.ipv4.conf.all.rp_filter\\>" "${SYSCONFIG_FILE}"; then
    escaped_formatted_output=$(sed -e 's|/|\\/|g' <<< "$formatted_output")
    LC_ALL=C sed -i --follow-symlinks "s/^net.ipv4.conf.all.rp_filter\\>.*/$escaped_formatted_output/gi" "${SYSCONFIG_FILE}"
else
    if [[ -s "${SYSCONFIG_FILE}" ]] && [[ -n "$(tail -c 1 -- "${SYSCONFIG_FILE}" || true)" ]]; then
        LC_ALL=C sed -i --follow-symlinks '$a'\\ "${SYSCONFIG_FILE}"
    fi
    printf '%s\n' "$formatted_output" >> "${SYSCONFIG_FILE}"
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - NIST-800-171-3.1.20
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - NIST-800-53-SC-7(a)
  - PCI-DSS-Req-1.4.3
  - PCI-DSSv4-1.4
  - PCI-DSSv4-1.4.3
  - disable_strategy
  - low_complexity
  - medium_disruption
  - medium_severity
  - reboot_required
  - sysctl_net_ipv4_conf_all_rp_filter

- name: List /etc/sysctl.d/*.conf files
  find:
    paths:
    - /etc/sysctl.d/
    - /run/sysctl.d/
    - /usr/local/lib/sysctl.d/
    contains: ^[\s]*net.ipv4.conf.all.rp_filter.*$
    patterns: '*.conf'
    file_type: any
  register: find_sysctl_d
  when: '"kernel" in ansible_facts.packages'
  tags:
  - NIST-800-171-3.1.20
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - NIST-800-53-SC-7(a)
  - PCI-DSS-Req-1.4.3
  - PCI-DSSv4-1.4
  - PCI-DSSv4-1.4.3
  - disable_strategy
  - low_complexity
  - medium_disruption
  - medium_severity
  - reboot_required
  - sysctl_net_ipv4_conf_all_rp_filter

- name: Comment out any occurrences of net.ipv4.conf.all.rp_filter from config files
  replace:
    path: '{{ item.path }}'
    regexp: ^[\s]*net.ipv4.conf.all.rp_filter
    replace: '#net.ipv4.conf.all.rp_filter'
  loop: '{{ find_sysctl_d.files }}'
  when: '"kernel" in ansible_facts.packages'
  tags:
  - NIST-800-171-3.1.20
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - NIST-800-53-SC-7(a)
  - PCI-DSS-Req-1.4.3
  - PCI-DSSv4-1.4
  - PCI-DSSv4-1.4.3
  - disable_strategy
  - low_complexity
  - medium_disruption
  - medium_severity
  - reboot_required
  - sysctl_net_ipv4_conf_all_rp_filter
- name: XCCDF Value sysctl_net_ipv4_conf_all_rp_filter_value # promote to variable
  set_fact:
    sysctl_net_ipv4_conf_all_rp_filter_value: !!str 1
  tags:
    - always

- name: Ensure sysctl net.ipv4.conf.all.rp_filter is set
  sysctl:
    name: net.ipv4.conf.all.rp_filter
    value: '{{ sysctl_net_ipv4_conf_all_rp_filter_value }}'
    sysctl_file: /etc/sysctl.conf
    state: present
    reload: true
  when: '"kernel" in ansible_facts.packages'
  tags:
  - NIST-800-171-3.1.20
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - NIST-800-53-SC-7(a)
  - PCI-DSS-Req-1.4.3
  - PCI-DSSv4-1.4
  - PCI-DSSv4-1.4.3
  - disable_strategy
  - low_complexity
  - medium_disruption
  - medium_severity
  - reboot_required
  - sysctl_net_ipv4_conf_all_rp_filter
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers