このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Use the status remapper processor to assign attributes as an official status to your events. For example, add an event severity level to your events with the status remapper.

Log severity after remapping

Each incoming status value is mapped as follows:

  • Integers from 0 to 7 map to the [Syslog severity standards][4]
  • Strings beginning with emerg or f (case-insensitive) map to emerg (0)
  • Strings beginning with a (case-insensitive) map to alert (1)
  • Strings beginning with c (case-insensitive) map to critical (2)
  • Strings beginning with e (case-insensitive)—that do not match emerg—map to error (3)
  • Strings beginning with w (case-insensitive) map to warning (4)
  • Strings beginning with n (case-insensitive) map to notice (5)
  • Strings beginning with i (case-insensitive) map to info (6)
  • Strings beginning with d, trace or verbose (case-insensitive) map to debug (7)
  • Strings beginning with o or s, or matching OK or Success (case-insensitive) map to OK
  • All others map to info (6)

Note: If multiple event status remapper processors are applied to a given event within a pipeline, only the first one in the pipeline’s order is considered. Additionally, for all pipelines that match the event, only the first status remapper encountered (from all applicable pipelines) is applied.

Example status remapper

Log severity remapping
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers