이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Network Device Monitoring

The Network Device Monitoring API allows you to fetch devices and interfaces and their attributes. See the Network Device Monitoring page for more information.

GET https://api.ap1.datadoghq.com/api/v2/ndm/deviceshttps://api.datadoghq.eu/api/v2/ndm/deviceshttps://api.ddog-gov.com/api/v2/ndm/deviceshttps://api.datadoghq.com/api/v2/ndm/deviceshttps://api.us3.datadoghq.com/api/v2/ndm/deviceshttps://api.us5.datadoghq.com/api/v2/ndm/devices

개요

Get the list of devices.

인수

쿼리 문자열

이름

유형

설명

page[number]

integer

The page number to fetch.

page[size]

integer

The number of devices to return per page.

sort

string

The field to sort the devices by.

filter[tag]

string

Filter devices by tag.

응답

OK

List devices response.

Expand All

항목

유형

설명

data

[object]

The list devices response data.

attributes

object

The device attributes

description

string

The device description

device_type

string

The device type

integration

string

The device integration

interface_statuses

object

Count of the device interfaces by status

down

int64

The number of interfaces that are down

off

int64

The number of interfaces that are off

up

int64

The number of interfaces that are up

warning

int64

The number of interfaces that are in a warning state

ip_address

string

The device IP address

location

string

The device location

model

string

The device model

name

string

The device name

os_hostname

string

The device OS hostname

os_name

string

The device OS name

os_version

string

The device OS version

ping_status

string

The device ping status

product_name

string

The device product name

serial_number

string

The device serial number

status

string

The device SNMP status

subnet

string

The device subnet

sys_object_id

string

The device sys_object_id

tags

[string]

The list of device tags

vendor

string

The device vendor

version

string

The device version

id

string

The device ID

type

string

The type of the resource. The value should always be device.

meta

object

Object describing meta attributes of response.

page

object

Pagination object.

total_filtered_count

int64

Total count of devices matched by the filter.

{
  "data": [
    {
      "attributes": {
        "description": "a device monitored with NDM",
        "device_type": "other",
        "integration": "snmp",
        "interface_statuses": {
          "down": "integer",
          "off": "integer",
          "up": "integer",
          "warning": "integer"
        },
        "ip_address": "1.2.3.4",
        "location": "paris",
        "model": "xx-123",
        "name": "example device",
        "os_hostname": "string",
        "os_name": "example OS",
        "os_version": "1.0.2",
        "ping_status": "unmonitored",
        "product_name": "example device",
        "serial_number": "X12345",
        "status": "ok",
        "subnet": "1.2.3.4/24",
        "sys_object_id": "1.3.6.1.4.1.99999",
        "tags": [
          "device_ip:1.2.3.4",
          "device_id:example:1.2.3.4"
        ],
        "vendor": "example vendor",
        "version": "1.2.3"
      },
      "id": "example:1.2.3.4",
      "type": "string"
    }
  ],
  "meta": {
    "page": {
      "total_filtered_count": 1
    }
  }
}

Bad Request

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

코드 사례

                  # Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ndm/devices" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get the list of devices returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.network_device_monitoring_api import NetworkDeviceMonitoringApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = NetworkDeviceMonitoringApi(api_client)
    response = api_instance.list_devices(
        page_number=0,
        page_size=1,
        filter_tag="device_namespace:default",
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Get the list of devices returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::NetworkDeviceMonitoringAPI.new
opts = {
  page_size: 1,
  page_number: 0,
  filter_tag: "device_namespace:default",
}
p api_instance.list_devices(opts)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Get the list of devices returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewNetworkDeviceMonitoringApi(apiClient)
	resp, r, err := api.ListDevices(ctx, *datadogV2.NewListDevicesOptionalParameters().WithPageSize(1).WithPageNumber(0).WithFilterTag("device_namespace:default"))

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `NetworkDeviceMonitoringApi.ListDevices`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `NetworkDeviceMonitoringApi.ListDevices`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Get the list of devices returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.NetworkDeviceMonitoringApi;
import com.datadog.api.client.v2.api.NetworkDeviceMonitoringApi.ListDevicesOptionalParameters;
import com.datadog.api.client.v2.model.ListDevicesResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    NetworkDeviceMonitoringApi apiInstance = new NetworkDeviceMonitoringApi(defaultClient);

    try {
      ListDevicesResponse result =
          apiInstance.listDevices(
              new ListDevicesOptionalParameters()
                  .pageSize(1L)
                  .pageNumber(0L)
                  .filterTag("device_namespace:default"));
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling NetworkDeviceMonitoringApi#listDevices");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Get the list of devices returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_network_device_monitoring::ListDevicesOptionalParams;
use datadog_api_client::datadogV2::api_network_device_monitoring::NetworkDeviceMonitoringAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = NetworkDeviceMonitoringAPI::with_config(configuration);
    let resp = api
        .list_devices(
            ListDevicesOptionalParams::default()
                .page_size(1)
                .page_number(0)
                .filter_tag("device_namespace:default".to_string()),
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Get the list of devices returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.NetworkDeviceMonitoringApi(configuration);

const params: v2.NetworkDeviceMonitoringApiListDevicesRequest = {
  pageNumber: 0,
  pageSize: 1,
  filterTag: "device_namespace:default",
};

apiInstance
  .listDevices(params)
  .then((data: v2.ListDevicesResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v2/ndm/devices/{device_id}https://api.datadoghq.eu/api/v2/ndm/devices/{device_id}https://api.ddog-gov.com/api/v2/ndm/devices/{device_id}https://api.datadoghq.com/api/v2/ndm/devices/{device_id}https://api.us3.datadoghq.com/api/v2/ndm/devices/{device_id}https://api.us5.datadoghq.com/api/v2/ndm/devices/{device_id}

개요

Get the device details.

인수

경로 파라미터

이름

유형

설명

device_id [required]

string

The id of the device to fetch.

응답

OK

The GetDevice operation’s response.

Expand All

항목

유형

설명

data

object

Get device response data.

attributes

object

The device attributes

description

string

A description of the device.

device_type

string

The type of the device.

integration

string

The integration of the device.

ip_address

string

The IP address of the device.

location

string

The location of the device.

model

string

The model of the device.

name

string

The name of the device.

os_hostname

string

The operating system hostname of the device.

os_name

string

The operating system name of the device.

os_version

string

The operating system version of the device.

ping_status

string

The ping status of the device.

product_name

string

The product name of the device.

serial_number

string

The serial number of the device.

status

string

The status of the device.

subnet

string

The subnet of the device.

sys_object_id

string

The device sys_object_id.

tags

[string]

A list of tags associated with the device.

vendor

string

The vendor of the device.

version

string

The version of the device.

id

string

The device ID

type

string

The type of the resource. The value should always be device.

{
  "data": {
    "attributes": {
      "description": "a device monitored with NDM",
      "device_type": "other",
      "integration": "snmp",
      "ip_address": "1.2.3.4",
      "location": "paris",
      "model": "xx-123",
      "name": "example device",
      "os_hostname": "1.0.2",
      "os_name": "example OS",
      "os_version": "1.0.2",
      "ping_status": "unmonitored",
      "product_name": "example device",
      "serial_number": "X12345",
      "status": "ok",
      "subnet": "1.2.3.4/24",
      "sys_object_id": "1.3.6.1.4.1.99999",
      "tags": [
        "device_ip:1.2.3.4",
        "device_id:example:1.2.3.4"
      ],
      "vendor": "example vendor",
      "version": "1.2.3"
    },
    "id": "example:1.2.3.4",
    "type": "string"
  }
}

Forbidden

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

코드 사례

                  # Path parameters
export device_id="example:1.2.3.4"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ndm/devices/${device_id}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get the device details returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.network_device_monitoring_api import NetworkDeviceMonitoringApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = NetworkDeviceMonitoringApi(api_client)
    response = api_instance.get_device(
        device_id="default_device",
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Get the device details returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::NetworkDeviceMonitoringAPI.new
p api_instance.get_device("default_device")

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Get the device details returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewNetworkDeviceMonitoringApi(apiClient)
	resp, r, err := api.GetDevice(ctx, "default_device")

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `NetworkDeviceMonitoringApi.GetDevice`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `NetworkDeviceMonitoringApi.GetDevice`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Get the device details returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.NetworkDeviceMonitoringApi;
import com.datadog.api.client.v2.model.GetDeviceResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    NetworkDeviceMonitoringApi apiInstance = new NetworkDeviceMonitoringApi(defaultClient);

    try {
      GetDeviceResponse result = apiInstance.getDevice("default_device");
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling NetworkDeviceMonitoringApi#getDevice");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Get the device details returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_network_device_monitoring::NetworkDeviceMonitoringAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = NetworkDeviceMonitoringAPI::with_config(configuration);
    let resp = api.get_device("default_device".to_string()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Get the device details returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.NetworkDeviceMonitoringApi(configuration);

const params: v2.NetworkDeviceMonitoringApiGetDeviceRequest = {
  deviceId: "default_device",
};

apiInstance
  .getDevice(params)
  .then((data: v2.GetDeviceResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v2/ndm/interfaceshttps://api.datadoghq.eu/api/v2/ndm/interfaceshttps://api.ddog-gov.com/api/v2/ndm/interfaceshttps://api.datadoghq.com/api/v2/ndm/interfaceshttps://api.us3.datadoghq.com/api/v2/ndm/interfaceshttps://api.us5.datadoghq.com/api/v2/ndm/interfaces

개요

Get the list of interfaces of the device.

인수

쿼리 문자열

이름

유형

설명

device_id [required]

string

The ID of the device to get interfaces from.

get_ip_addresses

boolean

Whether to get the IP addresses of the interfaces.

응답

OK

The GetInterfaces operation’s response.

Expand All

항목

유형

설명

data

[object]

Get Interfaces response

attributes

object

The interface attributes

alias

string

The interface alias

description

string

The interface description

index

int64

The interface index

ip_addresses

[string]

The interface IP addresses

mac_address

string

The interface MAC address

name

string

The interface name

status

enum

The interface status Allowed enum values: up,down,warning,off

id

string

The interface ID

type

string

The type of the resource. The value should always be interface.

{
  "data": [
    {
      "attributes": {
        "alias": "interface_0",
        "description": "a network interface",
        "index": 0,
        "ip_addresses": [
          "1.1.1.1",
          "1.1.1.2"
        ],
        "mac_address": "00:00:00:00:00:00",
        "name": "if0",
        "status": "up"
      },
      "id": "example:1.2.3.4:99",
      "type": "string"
    }
  ]
}

Forbidden

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

코드 사례

                  # Required query arguments
export device_id="example:1.2.3.4"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ndm/interfaces?device_id=${device_id}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get the list of interfaces of the device returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.network_device_monitoring_api import NetworkDeviceMonitoringApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = NetworkDeviceMonitoringApi(api_client)
    response = api_instance.get_interfaces(
        device_id="default:1.2.3.4",
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Get the list of interfaces of the device returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::NetworkDeviceMonitoringAPI.new
p api_instance.get_interfaces("default:1.2.3.4")

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Get the list of interfaces of the device returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewNetworkDeviceMonitoringApi(apiClient)
	resp, r, err := api.GetInterfaces(ctx, "default:1.2.3.4")

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `NetworkDeviceMonitoringApi.GetInterfaces`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `NetworkDeviceMonitoringApi.GetInterfaces`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Get the list of interfaces of the device returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.NetworkDeviceMonitoringApi;
import com.datadog.api.client.v2.model.GetInterfacesResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    NetworkDeviceMonitoringApi apiInstance = new NetworkDeviceMonitoringApi(defaultClient);

    try {
      GetInterfacesResponse result = apiInstance.getInterfaces("default:1.2.3.4");
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling NetworkDeviceMonitoringApi#getInterfaces");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Get the list of interfaces of the device returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_network_device_monitoring::NetworkDeviceMonitoringAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = NetworkDeviceMonitoringAPI::with_config(configuration);
    let resp = api.get_interfaces("default:1.2.3.4".to_string()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Get the list of interfaces of the device returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.NetworkDeviceMonitoringApi(configuration);

const params: v2.NetworkDeviceMonitoringApiGetInterfacesRequest = {
  deviceId: "default:1.2.3.4",
};

apiInstance
  .getInterfaces(params)
  .then((data: v2.GetInterfacesResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v2/ndm/tags/devices/{device_id}https://api.datadoghq.eu/api/v2/ndm/tags/devices/{device_id}https://api.ddog-gov.com/api/v2/ndm/tags/devices/{device_id}https://api.datadoghq.com/api/v2/ndm/tags/devices/{device_id}https://api.us3.datadoghq.com/api/v2/ndm/tags/devices/{device_id}https://api.us5.datadoghq.com/api/v2/ndm/tags/devices/{device_id}

개요

Get the list of tags for a device.

인수

경로 파라미터

이름

유형

설명

device_id [required]

string

The id of the device to fetch tags for.

응답

OK

List tags response.

Expand All

항목

유형

설명

data

object

The list tags response data.

attributes

object

The definition of ListTagsResponseDataAttributes object.

tags

[string]

The list of tags

id

string

The device ID

type

string

The type of the resource. The value should always be tags.

{
  "data": {
    "attributes": {
      "tags": [
        "tag:test",
        "tag:testbis"
      ]
    },
    "id": "example:1.2.3.4",
    "type": "string"
  }
}

Forbidden

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

코드 사례

                  # Path parameters
export device_id="example:1.2.3.4"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ndm/tags/devices/${device_id}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get the list of tags for a device returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.network_device_monitoring_api import NetworkDeviceMonitoringApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = NetworkDeviceMonitoringApi(api_client)
    response = api_instance.list_device_user_tags(
        device_id="default_device",
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Get the list of tags for a device returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::NetworkDeviceMonitoringAPI.new
p api_instance.list_device_user_tags("default_device")

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Get the list of tags for a device returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewNetworkDeviceMonitoringApi(apiClient)
	resp, r, err := api.ListDeviceUserTags(ctx, "default_device")

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `NetworkDeviceMonitoringApi.ListDeviceUserTags`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `NetworkDeviceMonitoringApi.ListDeviceUserTags`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Get the list of tags for a device returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.NetworkDeviceMonitoringApi;
import com.datadog.api.client.v2.model.ListTagsResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    NetworkDeviceMonitoringApi apiInstance = new NetworkDeviceMonitoringApi(defaultClient);

    try {
      ListTagsResponse result = apiInstance.listDeviceUserTags("default_device");
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling NetworkDeviceMonitoringApi#listDeviceUserTags");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Get the list of tags for a device returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_network_device_monitoring::NetworkDeviceMonitoringAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = NetworkDeviceMonitoringAPI::with_config(configuration);
    let resp = api
        .list_device_user_tags("default_device".to_string())
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Get the list of tags for a device returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.NetworkDeviceMonitoringApi(configuration);

const params: v2.NetworkDeviceMonitoringApiListDeviceUserTagsRequest = {
  deviceId: "default_device",
};

apiInstance
  .listDeviceUserTags(params)
  .then((data: v2.ListTagsResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PATCH https://api.ap1.datadoghq.com/api/v2/ndm/tags/devices/{device_id}https://api.datadoghq.eu/api/v2/ndm/tags/devices/{device_id}https://api.ddog-gov.com/api/v2/ndm/tags/devices/{device_id}https://api.datadoghq.com/api/v2/ndm/tags/devices/{device_id}https://api.us3.datadoghq.com/api/v2/ndm/tags/devices/{device_id}https://api.us5.datadoghq.com/api/v2/ndm/tags/devices/{device_id}

개요

Update the tags for a device.

인수

경로 파라미터

이름

유형

설명

device_id [required]

string

The id of the device to update tags for.

요청

Body Data (required)

Expand All

항목

유형

설명

data

object

The list tags response data.

attributes

object

The definition of ListTagsResponseDataAttributes object.

tags

[string]

The list of tags

id

string

The device ID

type

string

The type of the resource. The value should always be tags.

{
  "data": {
    "attributes": {
      "tags": [
        "tag:test",
        "tag:testbis"
      ]
    },
    "id": "default_device",
    "type": "tags"
  }
}

응답

OK

List tags response.

Expand All

항목

유형

설명

data

object

The list tags response data.

attributes

object

The definition of ListTagsResponseDataAttributes object.

tags

[string]

The list of tags

id

string

The device ID

type

string

The type of the resource. The value should always be tags.

{
  "data": {
    "attributes": {
      "tags": [
        "tag:test",
        "tag:testbis"
      ]
    },
    "id": "example:1.2.3.4",
    "type": "string"
  }
}

Forbidden

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

항목

유형

설명

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

코드 사례

                          # Path parameters
export device_id="example:1.2.3.4"
# Curl command
curl -X PATCH "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/ndm/tags/devices/${device_id}" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "data": { "attributes": { "tags": [ "tag:test", "tag:testbis" ] }, "id": "default_device", "type": "tags" } } EOF
// Update the tags for a device returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.ListTagsResponse{
		Data: &datadogV2.ListTagsResponseData{
			Attributes: &datadogV2.ListTagsResponseDataAttributes{
				Tags: []string{
					"tag:test",
					"tag:testbis",
				},
			},
			Id:   datadog.PtrString("default_device"),
			Type: datadog.PtrString("tags"),
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewNetworkDeviceMonitoringApi(apiClient)
	resp, r, err := api.UpdateDeviceUserTags(ctx, "default_device", body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `NetworkDeviceMonitoringApi.UpdateDeviceUserTags`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `NetworkDeviceMonitoringApi.UpdateDeviceUserTags`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Update the tags for a device returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.NetworkDeviceMonitoringApi;
import com.datadog.api.client.v2.model.ListTagsResponse;
import com.datadog.api.client.v2.model.ListTagsResponseData;
import com.datadog.api.client.v2.model.ListTagsResponseDataAttributes;
import java.util.Arrays;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    NetworkDeviceMonitoringApi apiInstance = new NetworkDeviceMonitoringApi(defaultClient);

    ListTagsResponse body =
        new ListTagsResponse()
            .data(
                new ListTagsResponseData()
                    .attributes(
                        new ListTagsResponseDataAttributes()
                            .tags(Arrays.asList("tag:test", "tag:testbis")))
                    .id("default_device")
                    .type("tags"));

    try {
      ListTagsResponse result = apiInstance.updateDeviceUserTags("default_device", body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling NetworkDeviceMonitoringApi#updateDeviceUserTags");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Update the tags for a device returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.network_device_monitoring_api import NetworkDeviceMonitoringApi
from datadog_api_client.v2.model.list_tags_response import ListTagsResponse
from datadog_api_client.v2.model.list_tags_response_data import ListTagsResponseData
from datadog_api_client.v2.model.list_tags_response_data_attributes import ListTagsResponseDataAttributes

body = ListTagsResponse(
    data=ListTagsResponseData(
        attributes=ListTagsResponseDataAttributes(
            tags=[
                "tag:test",
                "tag:testbis",
            ],
        ),
        id="default_device",
        type="tags",
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = NetworkDeviceMonitoringApi(api_client)
    response = api_instance.update_device_user_tags(device_id="default_device", body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Update the tags for a device returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::NetworkDeviceMonitoringAPI.new

body = DatadogAPIClient::V2::ListTagsResponse.new({
  data: DatadogAPIClient::V2::ListTagsResponseData.new({
    attributes: DatadogAPIClient::V2::ListTagsResponseDataAttributes.new({
      tags: [
        "tag:test",
        "tag:testbis",
      ],
    }),
    id: "default_device",
    type: "tags",
  }),
})
p api_instance.update_device_user_tags("default_device", body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Update the tags for a device returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_network_device_monitoring::NetworkDeviceMonitoringAPI;
use datadog_api_client::datadogV2::model::ListTagsResponse;
use datadog_api_client::datadogV2::model::ListTagsResponseData;
use datadog_api_client::datadogV2::model::ListTagsResponseDataAttributes;

#[tokio::main]
async fn main() {
    let body = ListTagsResponse::new().data(
        ListTagsResponseData::new()
            .attributes(
                ListTagsResponseDataAttributes::new()
                    .tags(vec!["tag:test".to_string(), "tag:testbis".to_string()]),
            )
            .id("default_device".to_string())
            .type_("tags".to_string()),
    );
    let configuration = datadog::Configuration::new();
    let api = NetworkDeviceMonitoringAPI::with_config(configuration);
    let resp = api
        .update_device_user_tags("default_device".to_string(), body)
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Update the tags for a device returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.NetworkDeviceMonitoringApi(configuration);

const params: v2.NetworkDeviceMonitoringApiUpdateDeviceUserTagsRequest = {
  body: {
    data: {
      attributes: {
        tags: ["tag:test", "tag:testbis"],
      },
      id: "default_device",
      type: "tags",
    },
  },
  deviceId: "default_device",
};

apiInstance
  .updateDeviceUserTags(params)
  .then((data: v2.ListTagsResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers