이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

aws_dms_replication_task

account_id

Type: STRING

cdc_start_position

Type: STRING
Provider name: CdcStartPosition
Description: Indicates when you want a change data capture (CDC) operation to start. Use either CdcStartPosition or CdcStartTime to specify when you want the CDC operation to start. Specifying both values results in an error. The value can be in date, checkpoint, or LSN/SCN format. Date Example: –cdc-start-position “2018-03-08T12:12:12” Checkpoint Example: –cdc-start-position “checkpoint:V1#27#mysql-bin-changelog.157832:1975:-1:2002:677883278264080:mysql-bin-changelog.157832:1876#0#0#*#0#93” LSN Example: –cdc-start-position “mysql-bin-changelog.000024:373”

cdc_stop_position

Type: STRING
Provider name: CdcStopPosition
Description: Indicates when you want a change data capture (CDC) operation to stop. The value can be either server time or commit time. Server time example: –cdc-stop-position “server_time:2018-02-09T12:12:12” Commit time example: –cdc-stop-position “commit_time:2018-02-09T12:12:12“

last_failure_message

Type: STRING
Provider name: LastFailureMessage
Description: The last error (failure) message generated for the replication task.

migration_type

Type: STRING
Provider name: MigrationType
Description: The type of migration.

recovery_checkpoint

Type: STRING
Provider name: RecoveryCheckpoint
Description: Indicates the last checkpoint that occurred during a change data capture (CDC) operation. You can provide this value to the CdcStartPosition parameter to start a CDC operation that begins at that checkpoint.

replication_instance_arn

Type: STRING
Provider name: ReplicationInstanceArn
Description: The ARN of the replication instance.

replication_task_arn

Type: STRING
Provider name: ReplicationTaskArn
Description: The Amazon Resource Name (ARN) of the replication task.

replication_task_creation_date

Type: TIMESTAMP
Provider name: ReplicationTaskCreationDate
Description: The date the replication task was created.

replication_task_identifier

Type: STRING
Provider name: ReplicationTaskIdentifier
Description: The user-assigned replication task identifier or name. Constraints:

  • Must contain 1-255 alphanumeric characters or hyphens.
  • First character must be a letter.
  • Cannot end with a hyphen or contain two consecutive hyphens.

replication_task_settings

Type: STRING
Provider name: ReplicationTaskSettings
Description: The settings for the replication task.

replication_task_start_date

Type: TIMESTAMP
Provider name: ReplicationTaskStartDate
Description: The date the replication task is scheduled to start.

replication_task_stats

Type: STRUCT
Provider name: ReplicationTaskStats
Description: The statistics for the task, including elapsed time, tables loaded, and table errors.

  • elapsed_time_millis
    Type: INT64
    Provider name: ElapsedTimeMillis
    Description: The elapsed time of the task, in milliseconds.
  • fresh_start_date
    Type: TIMESTAMP
    Provider name: FreshStartDate
    Description: The date the replication task was started either with a fresh start or a target reload.
  • full_load_finish_date
    Type: TIMESTAMP
    Provider name: FullLoadFinishDate
    Description: The date the replication task full load was completed.
  • full_load_progress_percent
    Type: INT32
    Provider name: FullLoadProgressPercent
    Description: The percent complete for the full load migration task.
  • full_load_start_date
    Type: TIMESTAMP
    Provider name: FullLoadStartDate
    Description: The date the replication task full load was started.
  • start_date
    Type: TIMESTAMP
    Provider name: StartDate
    Description: The date the replication task was started either with a fresh start or a resume. For more information, see StartReplicationTaskType.
  • stop_date
    Type: TIMESTAMP
    Provider name: StopDate
    Description: The date the replication task was stopped.
  • tables_errored
    Type: INT32
    Provider name: TablesErrored
    Description: The number of errors that have occurred during this task.
  • tables_loaded
    Type: INT32
    Provider name: TablesLoaded
    Description: The number of tables loaded for this task.
  • tables_loading
    Type: INT32
    Provider name: TablesLoading
    Description: The number of tables currently loading for this task.
  • tables_queued
    Type: INT32
    Provider name: TablesQueued
    Description: The number of tables queued for this task.

source_endpoint_arn

Type: STRING
Provider name: SourceEndpointArn
Description: The Amazon Resource Name (ARN) that uniquely identifies the endpoint.

status

Type: STRING
Provider name: Status
Description: The status of the replication task. This response parameter can return one of the following values:

stop_reason

Type: STRING
Provider name: StopReason
Description: The reason the replication task was stopped. This response parameter can return one of the following values:

  • “Stop Reason NORMAL”
  • “Stop Reason RECOVERABLE_ERROR”
  • “Stop Reason FATAL_ERROR”
  • “Stop Reason FULL_LOAD_ONLY_FINISHED”
  • “Stop Reason STOPPED_AFTER_FULL_LOAD” – Full load completed, with cached changes not applied
  • “Stop Reason STOPPED_AFTER_CACHED_EVENTS” – Full load completed, with cached changes applied
  • “Stop Reason EXPRESS_LICENSE_LIMITS_REACHED”
  • “Stop Reason STOPPED_AFTER_DDL_APPLY” – User-defined stop task after DDL applied
  • “Stop Reason STOPPED_DUE_TO_LOW_MEMORY”
  • “Stop Reason STOPPED_DUE_TO_LOW_DISK”
  • “Stop Reason STOPPED_AT_SERVER_TIME” – User-defined server time for stopping task
  • “Stop Reason STOPPED_AT_COMMIT_TIME” – User-defined commit time for stopping task
  • “Stop Reason RECONFIGURATION_RESTART”
  • “Stop Reason RECYCLE_TASK”

table_mappings

Type: STRING
Provider name: TableMappings
Description: Table mappings specified in the task.

tags

Type: UNORDERED_LIST_STRING

target_endpoint_arn

Type: STRING
Provider name: TargetEndpointArn
Description: The ARN that uniquely identifies the endpoint.

target_replication_instance_arn

Type: STRING
Provider name: TargetReplicationInstanceArn
Description: The ARN of the replication instance to which this task is moved in response to running the MoveReplicationTask operation. Otherwise, this response parameter isn’t a member of the ReplicationTask object.

task_data

Type: STRING
Provider name: TaskData
Description: Supplemental information that the task requires to migrate the data for certain source and target endpoints. For more information, see Specifying Supplemental Data for Task Settings in the Database Migration Service User Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers