이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

azure_automation_account

automation_hybrid_service_url

Type: STRING
Provider name: properties.automationHybridServiceUrl
Description: URL of automation hybrid service which is used for hybrid worker on-boarding.

creation_time

Type: STRING
Provider name: properties.creationTime
Description: Gets the creation time.

description

Type: STRING
Provider name: properties.description
Description: Gets or sets the description.

disable_local_auth

Type: BOOLEAN
Provider name: properties.disableLocalAuth
Description: Indicates whether requests using non-AAD authentication are blocked

etag

Type: STRING
Provider name: etag
Description: Gets or sets the etag of the resource.

id

Type: STRING
Provider name: id
Description: Fully qualified resource Id for the resource

identity

Type: STRUCT
Provider name: identity

  • principal_id
    Type: STRING
    Provider name: principalId
    Description: The principal ID of resource identity.
  • tenant_id
    Type: STRING
    Provider name: tenantId
    Description: The tenant ID of resource.
  • type
    Type: STRING
    Provider name: type
    Description: The identity type.

last_modified_by

Type: STRING
Provider name: properties.lastModifiedBy
Description: Gets or sets the last modified by.

last_modified_time

Type: STRING
Provider name: properties.lastModifiedTime
Description: Gets the last modified time.

location

Type: STRING
Provider name: location
Description: The Azure Region where the resource lives

name

Type: STRING
Provider name: name
Description: The name of the resource

private_endpoint_connections

Type: UNORDERED_LIST_STRUCT
Provider name: properties.privateEndpointConnections
Description: List of Automation operations supported by the Automation resource provider.

  • group_ids
    Type: UNORDERED_LIST_STRING
    Provider name: properties.groupIds
    Description: Gets the groupIds.
  • id
    Type: STRING
    Provider name: id
    Description: Fully qualified resource Id for the resource
  • name
    Type: STRING
    Provider name: name
    Description: The name of the resource
  • private_endpoint
    Type: STRUCT
    Provider name: properties.privateEndpoint
    Description: Private endpoint which the connection belongs to.
    • id
      Type: STRING
      Provider name: id
      Description: Resource id of the private endpoint.
  • private_link_service_connection_state
    Type: STRUCT
    Provider name: properties.privateLinkServiceConnectionState
    Description: Connection State of the Private Endpoint Connection.
    • actions_required
      Type: STRING
      Provider name: actionsRequired
      Description: Any action that is required beyond basic workflow (approve/ reject/ disconnect)
    • description
      Type: STRING
      Provider name: description
      Description: The private link service connection description.
    • status
      Type: STRING
      Provider name: status
      Description: The private link service connection status.
  • type
    Type: STRING
    Provider name: type
    Description: The type of the resource.

public_network_access

Type: BOOLEAN
Provider name: properties.publicNetworkAccess
Description: Indicates whether traffic on the non-ARM endpoint (Webhook/Agent) is allowed from the public internet

resource_group

Type: STRING

sku

Type: STRUCT
Provider name: properties.sku
Description: Gets or sets the SKU of account.

  • capacity
    Type: INT32
    Provider name: capacity
    Description: Gets or sets the SKU capacity.
  • family
    Type: STRING
    Provider name: family
    Description: Gets or sets the SKU family.
  • name
    Type: STRING
    Provider name: name
    Description: Gets or sets the SKU name of the account.

state

Type: STRING
Provider name: properties.state
Description: Gets status of account.

subscription_id

Type: STRING

subscription_name

Type: STRING

system_data

Type: STRUCT
Provider name: systemData
Description: Resource system metadata.

  • created_at
    Type: STRING
    Provider name: createdAt
    Description: The timestamp of resource creation (UTC).
  • created_by
    Type: STRING
    Provider name: createdBy
    Description: The identity that created the resource.
  • created_by_type
    Type: STRING
    Provider name: createdByType
    Description: The type of identity that created the resource.
  • last_modified_at
    Type: STRING
    Provider name: lastModifiedAt
    Description: The timestamp of resource last modification (UTC)
  • last_modified_by
    Type: STRING
    Provider name: lastModifiedBy
    Description: The identity that last modified the resource.
  • last_modified_by_type
    Type: STRING
    Provider name: lastModifiedByType
    Description: The type of identity that last modified the resource.

tags

Type: UNORDERED_LIST_STRING

type

Type: STRING
Provider name: type
Description: The type of the resource.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers