이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

gcp_bigtableadmin_table

ancestors

Type: UNORDERED_LIST_STRING

automated_backup_policy

Type: STRUCT
Provider name: automatedBackupPolicy
Description: If specified, automated backups are enabled for this table. Otherwise, automated backups are disabled.

  • frequency
    Type: STRING
    Provider name: frequency
    Description: How frequently automated backups should occur. The only supported value at this time is 24 hours. An undefined frequency is treated as 24 hours.
  • retention_period
    Type: STRING
    Provider name: retentionPeriod
    Description: Required. How long the automated backups should be retained. Values must be at least 3 days and at most 90 days.

change_stream_config

Type: STRUCT
Provider name: changeStreamConfig
Description: If specified, enable the change stream on this table. Otherwise, the change stream is disabled and the change stream is not retained.

  • retention_period
    Type: STRING
    Provider name: retentionPeriod
    Description: How long the change stream should be retained. Change stream data older than the retention period will not be returned when reading the change stream from the table. Values must be at least 1 day and at most 7 days, and will be truncated to microsecond granularity.

deletion_protection

Type: BOOLEAN
Provider name: deletionProtection
Description: Set to true to make the table protected against data loss. i.e. deleting the following resources through Admin APIs are prohibited: * The table. * The column families in the table. * The instance containing the table. Note one can still delete the data stored in the table through Data APIs.

granularity

Type: STRING
Provider name: granularity
Description: Immutable. The granularity (i.e. MILLIS) at which timestamps are stored in this table. Timestamps not matching the granularity will be rejected. If unspecified at creation time, the value will be set to MILLIS. Views: SCHEMA_VIEW, FULL.
Possible values:

  • TIMESTAMP_GRANULARITY_UNSPECIFIED - The user did not specify a granularity. Should not be returned. When specified during table creation, MILLIS will be used.
  • MILLIS - The table keeps data versioned at a granularity of 1ms.

labels

Type: UNORDERED_LIST_STRING

name

Type: STRING
Provider name: name
Description: The unique name of the table. Values are of the form projects/{project}/instances/{instance}/tables/_a-zA-Z0-9*. Views: NAME_ONLY, SCHEMA_VIEW, REPLICATION_VIEW, STATS_VIEW, FULL

organization_id

Type: STRING

parent

Type: STRING

project_id

Type: STRING

project_number

Type: STRING

resource_name

Type: STRING

restore_info

Type: STRUCT
Provider name: restoreInfo
Description: Output only. If this table was restored from another data source (e.g. a backup), this field will be populated with information about the restore.

  • backup_info
    Type: STRUCT
    Provider name: backupInfo
    Description: Information about the backup used to restore the table. The backup may no longer exist.
    • backup
      Type: STRING
      Provider name: backup
      Description: Output only. Name of the backup.
    • end_time
      Type: TIMESTAMP
      Provider name: endTime
      Description: Output only. This time that the backup was finished. Row data in the backup will be no newer than this timestamp.
    • source_backup
      Type: STRING
      Provider name: sourceBackup
      Description: Output only. Name of the backup from which this backup was copied. If a backup is not created by copying a backup, this field will be empty. Values are of the form: projects//instances//clusters//backups/
    • source_table
      Type: STRING
      Provider name: sourceTable
      Description: Output only. Name of the table the backup was created from.
    • start_time
      Type: TIMESTAMP
      Provider name: startTime
      Description: Output only. The time that the backup was started. Row data in the backup will be no older than this timestamp.
  • source_type
    Type: STRING
    Provider name: sourceType
    Description: The type of the restore source.
    Possible values:
    • RESTORE_SOURCE_TYPE_UNSPECIFIED - No restore associated.
    • BACKUP - A backup was used as the source of the restore.

stats

Type: STRUCT
Provider name: stats
Description: Output only. Only available with STATS_VIEW, this includes summary statistics about the entire table contents. For statistics about a specific column family, see ColumnFamilyStats in the mapped ColumnFamily collection above.

  • average_cells_per_column
    Type: DOUBLE
    Provider name: averageCellsPerColumn
    Description: How many cells are present per column (column family, column qualifier) combinations, averaged over all columns in all rows in the table. e.g. A table with 2 rows: * A row with 3 cells in “family:col” and 1 cell in “other:col” (4 cells / 2 columns) * A row with 1 cell in “family:col”, 7 cells in “family:other_col”, and 7 cells in “other:data” (15 cells / 3 columns) would report (4 + 15)/(2 + 3) = 3.8 in this field.
  • average_columns_per_row
    Type: DOUBLE
    Provider name: averageColumnsPerRow
    Description: How many (column family, column qualifier) combinations are present per row in the table, averaged over all rows in the table. e.g. A table with 2 rows: * A row with cells in “family:col” and “other:col” (2 distinct columns) * A row with cells in “family:col”, “family:other_col”, and “other:data” (3 distinct columns) would report (2 + 3)/2 = 2.5 in this field.
  • logical_data_bytes
    Type: INT64
    Provider name: logicalDataBytes
    Description: This is roughly how many bytes would be needed to read the entire table (e.g. by streaming all contents out).
  • row_count
    Type: INT64
    Provider name: rowCount
    Description: How many rows are in the table.

tags

Type: UNORDERED_LIST_STRING

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers