이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

gcp_firestore_database

ancestors

Type: UNORDERED_LIST_STRING

app_engine_integration_mode

Type: STRING
Provider name: appEngineIntegrationMode
Description: The App Engine integration mode to use for this database.
Possible values:

  • APP_ENGINE_INTEGRATION_MODE_UNSPECIFIED - Not used.
  • ENABLED - If an App Engine application exists in the same region as this database, App Engine configuration will impact this database. This includes disabling of the application & database, as well as disabling writes to the database.
  • DISABLED - App Engine has no effect on the ability of this database to serve requests. This is the default setting for databases created with the Firestore API.

cmek_config

Type: STRUCT
Provider name: cmekConfig
Description: Optional. Presence indicates CMEK is enabled for this database.

  • active_key_version
    Type: UNORDERED_LIST_STRING
    Provider name: activeKeyVersion
    Description: Output only. Currently in-use KMS key versions. During key rotation, there can be multiple in-use key versions. The expected format is projects/{project_id}/locations/{kms_location}/keyRings/{key_ring}/cryptoKeys/{crypto_key}/cryptoKeyVersions/{key_version}.
  • kms_key_name
    Type: STRING
    Provider name: kmsKeyName
    Description: Required. Only keys in the same location as this database are allowed to be used for encryption. For Firestore’s nam5 multi-region, this corresponds to Cloud KMS multi-region us. For Firestore’s eur3 multi-region, this corresponds to Cloud KMS multi-region europe. See https://cloud.google.com/kms/docs/locations. The expected format is projects/{project_id}/locations/{kms_location}/keyRings/{key_ring}/cryptoKeys/{crypto_key}.

concurrency_mode

Type: STRING
Provider name: concurrencyMode
Description: The concurrency control mode to use for this database.
Possible values:

  • CONCURRENCY_MODE_UNSPECIFIED - Not used.
  • OPTIMISTIC - Use optimistic concurrency control by default. This mode is available for Cloud Firestore databases.
  • PESSIMISTIC - Use pessimistic concurrency control by default. This mode is available for Cloud Firestore databases. This is the default setting for Cloud Firestore.
  • OPTIMISTIC_WITH_ENTITY_GROUPS - Use optimistic concurrency control with entity groups by default. This is the only available mode for Cloud Datastore. This mode is also available for Cloud Firestore with Datastore Mode but is not recommended.

create_time

Type: TIMESTAMP
Provider name: createTime
Description: Output only. The timestamp at which this database was created. Databases created before 2016 do not populate create_time.

delete_protection_state

Type: STRING
Provider name: deleteProtectionState
Description: State of delete protection for the database.
Possible values:

  • DELETE_PROTECTION_STATE_UNSPECIFIED - The default value. Delete protection type is not specified
  • DELETE_PROTECTION_DISABLED - Delete protection is disabled
  • DELETE_PROTECTION_ENABLED - Delete protection is enabled

delete_time

Type: TIMESTAMP
Provider name: deleteTime
Description: Output only. The timestamp at which this database was deleted. Only set if the database has been deleted.

earliest_version_time

Type: TIMESTAMP
Provider name: earliestVersionTime
Description: Output only. The earliest timestamp at which older versions of the data can be read from the database. See [version_retention_period] above; this field is populated with now - version_retention_period. This value is continuously updated, and becomes stale the moment it is queried. If you are using this value to recover data, make sure to account for the time from the moment when the value is queried to the moment when you initiate the recovery.

etag

Type: STRING
Provider name: etag
Description: This checksum is computed by the server based on the value of other fields, and may be sent on update and delete requests to ensure the client has an up-to-date value before proceeding.

key_prefix

Type: STRING
Provider name: keyPrefix
Description: Output only. The key_prefix for this database. This key_prefix is used, in combination with the project ID ("~") to construct the application ID that is returned from the Cloud Datastore APIs in Google App Engine first generation runtimes. This value may be empty in which case the appid to use for URL-encoded keys is the project_id (eg: foo instead of v~foo).

labels

Type: UNORDERED_LIST_STRING

location_id

Type: STRING
Provider name: locationId
Description: The location of the database. Available locations are listed at https://cloud.google.com/firestore/docs/locations.

name

Type: STRING
Provider name: name
Description: The resource name of the Database. Format: projects/{project}/databases/{database}

organization_id

Type: STRING

parent

Type: STRING

point_in_time_recovery_enablement

Type: STRING
Provider name: pointInTimeRecoveryEnablement
Description: Whether to enable the PITR feature on this database.
Possible values:

  • POINT_IN_TIME_RECOVERY_ENABLEMENT_UNSPECIFIED - Not used.
  • POINT_IN_TIME_RECOVERY_ENABLED - Reads are supported on selected versions of the data from within the past 7 days: * Reads against any timestamp within the past hour * Reads against 1-minute snapshots beyond 1 hour and within 7 days version_retention_period and earliest_version_time can be used to determine the supported versions.
  • POINT_IN_TIME_RECOVERY_DISABLED - Reads are supported on any version of the data from within the past 1 hour.

previous_id

Type: STRING
Provider name: previousId
Description: Output only. The database resource’s prior database ID. This field is only populated for deleted databases.

project_id

Type: STRING

project_number

Type: STRING

resource_name

Type: STRING

source_info

Type: STRUCT
Provider name: sourceInfo
Description: Output only. Information about the provenance of this database.

  • backup
    Type: STRUCT
    Provider name: backup
    Description: If set, this database was restored from the specified backup (or a snapshot thereof).
    • backup
      Type: STRING
      Provider name: backup
      Description: The resource name of the backup that was used to restore this database. Format: projects/{project}/locations/{location}/backups/{backup}.
  • operation
    Type: STRING
    Provider name: operation
    Description: The associated long-running operation. This field may not be set after the operation has completed. Format: projects/{project}/databases/{database}/operations/{operation}.

tags

Type: UNORDERED_LIST_STRING

type

Type: STRING
Provider name: type
Description: The type of the database. See https://cloud.google.com/datastore/docs/firestore-or-datastore for information about how to choose.
Possible values:

  • DATABASE_TYPE_UNSPECIFIED - Not used.
  • FIRESTORE_NATIVE - Firestore Native Mode
  • DATASTORE_MODE - Firestore in Datastore Mode.

uid

Type: STRING
Provider name: uid
Description: Output only. The system-generated UUID4 for this Database.

update_time

Type: TIMESTAMP
Provider name: updateTime
Description: Output only. The timestamp at which this database was most recently updated. Note this only includes updates to the database resource and not data contained by the database.

version_retention_period

Type: STRING
Provider name: versionRetentionPeriod
Description: Output only. The period during which past versions of data are retained in the database. Any read or query can specify a read_time within this window, and will read the state of the database at that time. If the PITR feature is enabled, the retention period is 7 days. Otherwise, the retention period is 1 hour.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers