Microsoft Azure Analysis Services

개요

Azure Analysis Services는 클라우드에서 엔터프라이즈급 데이터 모델을 제공하는 완전 관리형 PaaS(Platform as a Service)입니다.

Datadog Azure 통합을 사용하여 Azure Analysis Services에서 메트릭을 수집합니다.

설정

설치

아직 설정하지 않았다면, 먼저 Microsoft Azure 통합을 설정하세요. 그 외 다른 설치 단계는 없습니다.

수집한 데이터

메트릭

azure.analysisservices_servers.command_pool_job_queue_length
(count)
Number of jobs in the queue of the command thread pool.
Shown as job
azure.analysisservices_servers.connection_current_connections
(count)
Current number of client connections established.
Shown as connection
azure.analysisservices_servers.current_user_sessions
(count)
Current number of user sessions established.
Shown as session
azure.analysisservices_servers.m_engine_memory
(gauge)
Memory usage by mashup engine processes
Shown as byte
azure.analysisservices_servers.m_engine_private_bytes
(gauge)
Private bytes usage by mashup engine processes
Shown as byte
azure.analysisservices_servers.m_engine_qpu
(count)
QPU usage by mashup engine processes
azure.analysisservices_servers.m_engine_virtual_bytes
(gauge)
Virtual bytes usage by mashup engine processes
Shown as byte
azure.analysisservices_servers.memory_cleaner_current_price
(count)
Current price of memory, $/byte/time, normalized to 1000.
azure.analysisservices_servers.memory_cleaner_memory_nonshrinkable
(gauge)
Amount of memory, in bytes, not subject to purging by the background cleaner.
Shown as byte
azure.analysisservices_servers.memory_cleaner_memory_shrinkable
(gauge)
Amount of memory, in bytes, subject to purging by the background cleaner.
Shown as byte
azure.analysisservices_servers.memory_memory_limit_hard
(gauge)
Hard memory limit, from configuration file.
Shown as byte
azure.analysisservices_servers.memory_memory_limit_high
(gauge)
High memory limit, from configuration file.
Shown as byte
azure.analysisservices_servers.memory_memory_limit_low
(gauge)
Low memory limit, from configuration file.
Shown as byte
azure.analysisservices_servers.memory_memory_limit_verti_paq
(gauge)
In-memory limit, from configuration file.
Shown as byte
azure.analysisservices_servers.memory_memory_usage
(gauge)
Memory usage of the server process as used in calculating cleaner memory price. Equal to counter Process\PrivateBytes plus the size of memory-mapped data, ignoring any memory which was mapped or allocated by the xVelocity in-memory analytics engine (VertiPaq) in excess of the xVelocity engine Memory Limit.
Shown as byte
azure.analysisservices_servers.memory_metric
(gauge)
Memory. Range 0-25 GB for S1, 0-50 GB for S2 and 0-100 GB for S4
Shown as byte
azure.analysisservices_servers.memory_quota
(gauge)
Current memory quota, in bytes. Memory quota is also known as a memory grant or memory reservation.
Shown as byte
azure.analysisservices_servers.memory_quota_blocked
(count)
Current number of quota requests that are blocked until other memory quotas are freed.
azure.analysisservices_servers.memory_thrashing
(gauge)
Average memory thrashing.
Shown as percent
azure.analysisservices_servers.memory_verti_paq_nonpaged
(gauge)
Bytes of memory locked in the working set for use by the in-memory engine.
Shown as byte
azure.analysisservices_servers.memory_verti_paq_paged
(gauge)
Bytes of paged memory in use for in-memory data.
Shown as byte
azure.analysisservices_servers.processing_pool_job_queue_length
(count)
Number of non-I/O jobs in the queue of the processing thread pool.
Shown as job
azure.analysisservices_servers.processing_rows_converted_per_sec
(rate)
Rate of rows converted during processing.
Shown as row
azure.analysisservices_servers.processing_rows_read_per_sec
(rate)
Rate of rows read from all relational databases.
Shown as row
azure.analysisservices_servers.processing_rows_written_per_sec
(rate)
Rate of rows written during processing.
Shown as row
azure.analysisservices_servers.qpu_metric
(gauge)
QPU. Range 0-100 for S1, 0-200 for S2 and 0-400 for S4
Shown as unit
azure.analysisservices_servers.query_pool_busy_threads
(count)
Number of busy threads in the query thread pool.
Shown as thread
azure.analysisservices_servers.successfull_connections_per_sec
(rate)
Rate of successful connection completions.
Shown as connection
azure.analysisservices_servers.threads_command_pool_busy_threads
(count)
Number of busy threads in the command thread pool.
Shown as thread
azure.analysisservices_servers.threads_command_pool_idle_threads
(count)
Number of idle threads in the command thread pool.
Shown as thread
azure.analysisservices_servers.threads_long_parsing_busy_threads
(count)
Number of busy threads in the long parsing thread pool.
Shown as thread
azure.analysisservices_servers.threads_long_parsing_idle_threads
(count)
Number of idle threads in the long parsing thread pool.
Shown as thread
azure.analysisservices_servers.threads_long_parsing_job_queue_length
(count)
Number of jobs in the queue of the long parsing thread pool.
Shown as job
azure.analysisservices_servers.threads_processing_pool_busy_i_o_job_threads
(count)
Number of threads running I/O jobs in the processing thread pool.
Shown as thread
azure.analysisservices_servers.threads_processing_pool_busy_non_i_o_threads
(count)
Number of threads running non-I/O jobs in the processing thread pool.
Shown as thread
azure.analysisservices_servers.threads_processing_pool_i_o_job_queue_length
(count)
Number of I/O jobs in the queue of the processing thread pool.
Shown as job
azure.analysisservices_servers.threads_processing_pool_idle_i_o_job_threads
(count)
Number of idle threads for I/O jobs in the processing thread pool.
Shown as thread
azure.analysisservices_servers.threads_processing_pool_idle_non_i_o_threads
(count)
Number of idle threads in the processing thread pool dedicated to non-I/O jobs.
Shown as thread
azure.analysisservices_servers.threads_query_pool_idle_threads
(count)
Number of idle threads for I/O jobs in the processing thread pool.
Shown as thread
azure.analysisservices_servers.threads_query_pool_job_queue_length
(count)
Number of jobs in the queue of the query thread pool.
Shown as job
azure.analysisservices_servers.threads_short_parsing_busy_threads
(count)
Number of busy threads in the short parsing thread pool.
Shown as thread
azure.analysisservices_servers.threads_short_parsing_idle_threads
(count)
Number of idle threads in the short parsing thread pool.
Shown as thread
azure.analysisservices_servers.threads_short_parsing_job_queue_length
(count)
Number of jobs in the queue of the short parsing thread pool.
Shown as job
azure.analysisservices_servers.total_connection_failures
(count)
Total failed connection attempts.
Shown as connection
azure.analysisservices_servers.total_connection_requests
(count)
Total connection requests. These are arrivals.
Shown as request
azure.analysisservices_servers.count
(gauge)
The count of Azure Analysis Services resources

이벤트

Azure Analysis Services 통합에는 이벤트가 포함되지 않습니다.

서비스 점검

Azure Analysis Services 통합에는 서비스 점검이 포함되지 않습니다.

트러블슈팅

도움이 필요하신가요? Datadog 지원팀에 문의하세요.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers