Microsoft Azure Blob Storage

개요

Azure Blob Storage는 클라우드용 Microsoft 개체 스토리지 솔루션입니다. 구조화되지 않은 데이터를 대량으로 저장하기 위해 Blog 스토리지를 최적화합니다. Azure Blob Storage에서 메트릭을 얻으면 다음을 할 수 있습니다.

  • Blog Storage의 성능 가시화
  • Blog Storage의 성능과 애플리케이션의 상관 관계 파악

설정

설치

아직 설정하지 않았다면, 먼저 Microsoft Azure 통합을 설정하세요. 그 외 다른 설치 단계는 없습니다.

수집한 데이터

메트릭

azure.storage_storageaccounts_blobservices.availability
(gauge)
The percentage of availability for the storage service or the specified API operation. Availability is calculated by taking the TotalBillableRequests value and dividing it by the number of applicable requests including those that produced unexpected errors. All unexpected errors result in reduced availability for the storage service or the specified API operation.
Shown as percent
azure.storage_storageaccounts_blobservices.blob_capacity
(gauge)
The amount of storage used by the storage account's Blob service in bytes.
Shown as byte
azure.storage_storageaccounts_blobservices.blob_count
(count)
The number of Blob in the storage account's Blob service.
azure.storage_storageaccounts_blobservices.container_count
(count)
The number of containers in the storage account's Blob service.
azure.storage_storageaccounts_blobservices.egress
(gauge)
The amount of egress data in bytes. This number includes egress from an external client into Azure Storage as well as egress within Azure. As a result this number does not reflect billable egress.
Shown as byte
azure.storage_storageaccounts_blobservices.ingress
(gauge)
The amount of ingress data in bytes. This number includes ingress from an external client into Azure Storage as well as ingress within Azure.
Shown as byte
azure.storage_storageaccounts_blobservices.success_e2_elatency
(gauge)
The average end-to-end latency of successful requests made to a storage service or the specified API operation in milliseconds. This value includes the required processing time within Azure Storage to read the request send the response and receive acknowledgment of the response.
Shown as millisecond
azure.storage_storageaccounts_blobservices.success_server_latency
(gauge)
The average latency used by Azure Storage to process a successful request in milliseconds. This value does not include the network latency specified in AverageE2ELatency.
Shown as millisecond
azure.storage_storageaccounts_blobservices.transactions
(count)
The number of requests made to a storage service or the specified API operation. This number includes successful and failed requests as well as requests which produced errors. Use ResponseType dimension for the number of different type of response.
azure.storage_storageaccounts_blobservices.blob_provisioned_size
(gauge)
The amount of storage provisioned in the storage account’s Blob service in bytes.
Shown as byte
azure.storage_storageaccounts_blobservices.index_capacity
(gauge)
The amount of storage used by Azure Data Lake Storage Gen2 hierarchical index.
Shown as byte

이벤트

Azure Blob Storage 통합에는 이벤트가 포함되어 있지 않습니다.

서비스 점검

Azure Blob Storage 통합에는 서비스 점검이 포함되어 있지 않습니다.

트러블슈팅

도움이 필요하신가요? Datadog 지원팀에 문의하세요.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers