Lightbend

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.
Lightbend Reactive Platform Dashboard

Overview

Get metrics from your Lightbend Reactive Platform application in real time to:

  • Visualize performance metrics of your actors.
  • Track unexpected events (exceptions, unhandled messages, dead letters, a.s.o.).
  • Get an insight into the remoting characteristics of your application.
  • Drill down into dispatcher metrics to tune the application performance.

Setup

Installation

This integration uses Lightbend Monitoring which requires a subscription.

The easiest way to integrate Lightbend Monitoring with Datadog is to use the Datadog plugin.

By default, Lightbend Monitoring sends all metrics over the wire, but it is possible to limit fields reported with the configuration (see the example below).

The Datadog plugin uses a default configuration that can be overridden:

cinnamon.datadog {
  statsd {
    host = "192.168.0.1"
    port = 8888
    frequency = 60s
  }

  report {
    histogram = ["min", "max", "p98", "p99", "p999"]
  }
}

The configuration values explained:

  • cinnamon.datadog.statsd.host: IP address of your DogStatsD instance.
  • cinnamon.datadog.statsd.port: port number of your DogStatsD instance.
  • cinnamon.datadog.statsd.frequency: the frequency that data is pushed from Cinnamon to the DogStatsD instance.
  • cinnamon.datadog.report.histogram: instruction for how to filter histogram data sent to DogStatsD. In the above example only max and p99 are sent.

See the Lightbend Monitoring documentation for more details on configuration.

Data Collected

Metrics

lightbend.actors.running_actors
(gauge)
Total number of running actors in this actor class or group.
lightbend.actors.mailbox_size.max
(gauge)
Maximum number of messages in an actor's mailbox.
Shown as message
lightbend.actors.mailbox_size.mean
(gauge)
Average number of messages in an actor's mailbox.
Shown as message
lightbend.actors.mailbox_size.median
(gauge)
Median number of messages in an actor's mailbox.
Shown as message
lightbend.actors.mailbox_size.min
(gauge)
Minimum number of messages in an actor's mailbox.
Shown as message
lightbend.actors.mailbox_size.p75
(gauge)
75th percentile number of messages in an actor's mailbox.
Shown as message
lightbend.actors.mailbox_size.p95
(gauge)
95th percentile number of messages in an actor's mailbox.
Shown as message
lightbend.actors.mailbox_size.p98
(gauge)
98th percentile number of messages in an actor's mailbox.
Shown as message
lightbend.actors.mailbox_size.p99
(gauge)
99th percentile number of messages in an actor's mailbox.
Shown as message
lightbend.actors.mailbox_size.p999
(gauge)
99.9th percentile number of messages in an actor's mailbox.
Shown as message
lightbend.actors.mailbox_size.stddev
(gauge)
Standard deviation for the number of messages in an actor's mailbox.
Shown as message
lightbend.actors.mailbox_time.max
(gauge)
Maximum time that messages are in an actor's mailbox.
Shown as nanosecond
lightbend.actors.mailbox_time.mean
(gauge)
Average time that messages are in an actor's mailbox.
Shown as nanosecond
lightbend.actors.mailbox_time.median
(gauge)
Median time that messages are in an actor's mailbox.
Shown as nanosecond
lightbend.actors.mailbox_time.min
(gauge)
Minimum time that messages are in an actor's mailbox.
Shown as nanosecond
lightbend.actors.mailbox_time.p75
(gauge)
75th percentile time that messages are in an actor's mailbox.
Shown as nanosecond
lightbend.actors.mailbox_time.p95
(gauge)
95th percentile time that messages are in an actor's mailbox.
Shown as nanosecond
lightbend.actors.mailbox_time.p98
(gauge)
98th percentile time that messages are in an actor's mailbox.
Shown as nanosecond
lightbend.actors.mailbox_time.p99
(gauge)
99th percentile time that messages are in an actor's mailbox.
Shown as nanosecond
lightbend.actors.mailbox_time.p999
(gauge)
99.9th percentile time that messages are in an actor's mailbox.
Shown as nanosecond
lightbend.actors.mailbox_time.stddev
(gauge)
Standard deviation for the time that messages are in an actor's mailbox.
Shown as nanosecond
lightbend.actors.processed_messages.mean_rate
(gauge)
Average rate of messages processed by an actor.
Shown as message
lightbend.actors.processed_messages.min1_rate
(gauge)
1 minute rate of messages processed by an actor.
Shown as message
lightbend.actors.processed_messages.min15_rate
(gauge)
15 minute rate of messages processed by an actor.
Shown as message
lightbend.actors.processed_messages.min5_rate
(gauge)
5 minute rate of messages processed by an actor.
Shown as message
lightbend.actors.processed_messages.samples
(gauge)
Total number of messages processed by an actor.
Shown as message
lightbend.actors.processing_time.max
(gauge)
Maximum time for actor message processing.
Shown as nanosecond
lightbend.actors.processing_time.mean
(gauge)
Average time for actor message processing.
Shown as nanosecond
lightbend.actors.processing_time.median
(gauge)
Median time for actor message processing.
Shown as nanosecond
lightbend.actors.processing_time.min
(gauge)
Minimum time for actor message processing.
Shown as nanosecond
lightbend.actors.processing_time.p75
(gauge)
75th percentile time for actor message processing.
Shown as nanosecond
lightbend.actors.processing_time.p95
(gauge)
95th percentile time for actor message processing.
Shown as nanosecond
lightbend.actors.processing_time.p98
(gauge)
98th percentile time for actor message processing.
Shown as nanosecond
lightbend.actors.processing_time.p99
(gauge)
99th percentile time for actor message processing.
Shown as nanosecond
lightbend.actors.processing_time.p999
(gauge)
99.9th percentile time for actor message processing.
Shown as nanosecond
lightbend.actors.processing_time.stddev
(gauge)
Standard deviation for the time for actor message processing.
Shown as nanosecond
lightbend.actors.sent_messages.mean_rate
(gauge)
Average rate of messages sent by an actor.
Shown as message
lightbend.actors.sent_messages.min1_rate
(gauge)
1 minute rate of messages sent by an actor.
Shown as message
lightbend.actors.sent_messages.min15_rate
(gauge)
15 minute rate of messages sent by an actor.
Shown as message
lightbend.actors.sent_messages.min5_rate
(gauge)
5 minute rate of messages sent by an actor.
Shown as message
lightbend.actors.sent_messages.samples
(gauge)
Total number of messages sent by an actor.
Shown as message
lightbend.actors.stash_size.max
(gauge)
Maximum number of messages in an actor's stash.
Shown as message
lightbend.actors.stash_size.mean
(gauge)
Average number of messages in an actor's stash.
Shown as message
lightbend.actors.stash_size.median
(gauge)
Median number of messages in an actor's stash.
Shown as message
lightbend.actors.stash_size.min
(gauge)
Minimum number of messages in an actor's stash.
Shown as message
lightbend.actors.stash_size.p75
(gauge)
75th percentile number of messages in an actor's stash.
Shown as message
lightbend.actors.stash_size.p95
(gauge)
95th percentile number of messages in an actor's stash.
Shown as message
lightbend.actors.stash_size.p98
(gauge)
98th percentile number of messages in an actor's stash.
Shown as message
lightbend.actors.stash_size.p99
(gauge)
99th percentile number of messages in an actor's stash.
Shown as message
lightbend.actors.stash_size.p999
(gauge)
99.9th percentile number of messages in an actor's stash.
Shown as message
lightbend.actors.stash_size.stddev
(gauge)
Standard deviation for the number of messages in an actor's stash.
Shown as message
lightbend.actors.actor_failure.mean_rate
(gauge)
Average rate of actor failures.
Shown as error
lightbend.actors.actor_failure.min1_rate
(gauge)
1 minute rate of actor failures.
Shown as error
lightbend.actors.actor_failure.min15_rate
(gauge)
15 minute rate of actor failures.
Shown as error
lightbend.actors.actor_failure.min5_rate
(gauge)
5 minute rate of actor failures.
Shown as error
lightbend.actors.actor_failure.samples
(gauge)
Total number of actor failures.
Shown as error
lightbend.actors.dead_letter.mean_rate
(gauge)
Average rate of actor dead letters.
Shown as event
lightbend.actors.dead_letter.min1_rate
(gauge)
1 minute rate of actor dead letters.
Shown as event
lightbend.actors.dead_letter.min15_rate
(gauge)
15 minute rate of actor dead letters.
Shown as event
lightbend.actors.dead_letter.min5_rate
(gauge)
5 minute rate of actor dead letters.
Shown as event
lightbend.actors.dead_letter.samples
(gauge)
Total number of actor dead letters.
Shown as event
lightbend.actors.unhandled_message.mean_rate
(gauge)
Average rate of unhandled actor messages.
Shown as event
lightbend.actors.unhandled_message.min1_rate
(gauge)
1 minute rate of unhandled actor messages.
Shown as event
lightbend.actors.unhandled_message.min15_rate
(gauge)
15 minute rate of unhandled actor messages.
Shown as event
lightbend.actors.unhandled_message.min5_rate
(gauge)
5 minute rate of unhandled actor messages.
Shown as event
lightbend.actors.unhandled_message.samples
(gauge)
Total number of unhandled actor messages.
Shown as event
lightbend.actors.log_error.mean_rate
(gauge)
Average rate of actor log errors.
Shown as error
lightbend.actors.log_error.min1_rate
(gauge)
1 minute rate of actor log errors.
Shown as error
lightbend.actors.log_error.min15_rate
(gauge)
15 minute rate of actor log errors.
Shown as error
lightbend.actors.log_error.min5_rate
(gauge)
5 minute rate of actor log errors.
Shown as error
lightbend.actors.log_error.samples
(gauge)
Total number of actor log errors.
Shown as error
lightbend.actors.log_warning.mean_rate
(gauge)
Average rate of actor log warnings.
Shown as event
lightbend.actors.log_warning.min1_rate
(gauge)
1 minute rate of actor log warnings.
Shown as event
lightbend.actors.log_warning.min15_rate
(gauge)
15 minute rate of actor log warnings.
Shown as event
lightbend.actors.log_warning.min5_rate
(gauge)
5 minute rate of actor log warnings.
Shown as event
lightbend.actors.log_warning.samples
(gauge)
Total number of actor log warnings.
Shown as event
lightbend.actors.mailbox_size_limit.mean_rate
(gauge)
Average rate of threshold limit events for actor mailbox size.
Shown as event
lightbend.actors.mailbox_size_limit.min1_rate
(gauge)
1 minute rate of threshold limit events for actor mailbox size.
Shown as event
lightbend.actors.mailbox_size_limit.min15_rate
(gauge)
15 minute rate of threshold limit events for actor mailbox size.
Shown as event
lightbend.actors.mailbox_size_limit.min5_rate
(gauge)
5 minute rate of threshold limit events for actor mailbox size.
Shown as event
lightbend.actors.mailbox_size_limit.samples
(gauge)
Total number of threshold limit events for actor mailbox size.
Shown as event
lightbend.actors.mailbox_time_limit.mean_rate
(gauge)
Average rate of threshold limit events for time in actor mailbox.
Shown as event
lightbend.actors.mailbox_time_limit.min1_rate
(gauge)
1 minute rate of threshold limit events for time in actor mailbox.
Shown as event
lightbend.actors.mailbox_time_limit.min15_rate
(gauge)
15 minute rate of threshold limit events for time in actor mailbox.
Shown as event
lightbend.actors.mailbox_time_limit.min5_rate
(gauge)
5 minute rate of threshold limit events for time in actor mailbox.
Shown as event
lightbend.actors.mailbox_time_limit.samples
(gauge)
Total number of threshold limit events for time in actor mailbox.
Shown as event
lightbend.actors.processing_time_limit.mean_rate
(gauge)
Average rate of threshold limit events for actor message processing time.
Shown as message
lightbend.actors.processing_time_limit.min1_rate
(gauge)
1 minute rate of threshold limit events for actor message processing time.
Shown as message
lightbend.actors.processing_time_limit.min15_rate
(gauge)
15 minute rate of threshold limit events for actor message processing time.
Shown as message
lightbend.actors.processing_time_limit.min5_rate
(gauge)
5 minute rate of threshold limit events for actor message processing time.
Shown as message
lightbend.actors.processing_time_limit.samples
(gauge)
Total number of threshold limit events for actor message processing time.
Shown as message
lightbend.actors.stash_size_limit.mean_rate
(gauge)
Average rate of threshold limit events for actor stash size.
Shown as message
lightbend.actors.stash_size_limit.min1_rate
(gauge)
1 minute rate of threshold limit events for actor stash size.
Shown as message
lightbend.actors.stash_size_limit.min15_rate
(gauge)
15 minute rate of threshold limit events for actor stash size.
Shown as message
lightbend.actors.stash_size_limit.min5_rate
(gauge)
5 minute rate of threshold limit events for actor stash size.
Shown as message
lightbend.actors.stash_size_limit.samples
(gauge)
Total number of threshold limit events for actor stash size.
Shown as message
lightbend.dispatchers.processing
(gauge)
Current number of tasks being processed by a dispatcher.
Shown as task
lightbend.dispatchers.processing_time.max
(gauge)
Maximum time for processing tasks in a dispatcher.
Shown as nanosecond
lightbend.dispatchers.processing_time.mean
(gauge)
Average time for processing tasks in a dispatcher.
Shown as nanosecond
lightbend.dispatchers.processing_time.median
(gauge)
Median time for processing tasks in a dispatcher.
Shown as nanosecond
lightbend.dispatchers.processing_time.min
(gauge)
Minimum time for processing tasks in a dispatcher.
Shown as nanosecond
lightbend.dispatchers.processing_time.p75
(gauge)
75th percentile time for processing tasks in a dispatcher.
Shown as nanosecond
lightbend.dispatchers.processing_time.p95
(gauge)
95th percentile time for processing tasks in a dispatcher.
Shown as nanosecond
lightbend.dispatchers.processing_time.p98
(gauge)
98th percentile time for processing tasks in a dispatcher.
Shown as nanosecond
lightbend.dispatchers.processing_time.p99
(gauge)
99th percentile time for processing tasks in a dispatcher.
Shown as nanosecond
lightbend.dispatchers.processing_time.p999
(gauge)
99.9th percentile time for processing tasks in a dispatcher.
Shown as nanosecond
lightbend.dispatchers.processing_time.stddev
(gauge)
Standard deviation for the time for processing tasks in a dispatcher.
Shown as nanosecond
lightbend.dispatchers.queue_size
(gauge)
Current number of tasks queued to be processed by a dispatcher.
Shown as task
lightbend.dispatchers.queue_time.max
(gauge)
Maximum queue time for tasks waiting to be processed by a dispatcher.
Shown as nanosecond
lightbend.dispatchers.queue_time.mean
(gauge)
Average queue time for tasks waiting to be processed by a dispatcher.
Shown as nanosecond
lightbend.dispatchers.queue_time.median
(gauge)
Median queue time for tasks waiting to be processed by a dispatcher.
Shown as nanosecond
lightbend.dispatchers.queue_time.min
(gauge)
Minimum queue time for tasks waiting to be processed by a dispatcher.
Shown as nanosecond
lightbend.dispatchers.queue_time.p75
(gauge)
75th percentile queue time for tasks waiting to be processed by a dispatcher.
Shown as nanosecond
lightbend.dispatchers.queue_time.p95
(gauge)
95th percentile queue time for tasks waiting to be processed by a dispatcher.
Shown as nanosecond
lightbend.dispatchers.queue_time.p98
(gauge)
98th percentile queue time for tasks waiting to be processed by a dispatcher.
Shown as nanosecond
lightbend.dispatchers.queue_time.p99
(gauge)
99th percentile queue time for tasks waiting to be processed by a dispatcher.
Shown as nanosecond
lightbend.dispatchers.queue_time.p999
(gauge)
99.9th percentile queue time for tasks waiting to be processed by a dispatcher.
Shown as nanosecond
lightbend.dispatchers.queue_time.stddev
(gauge)
Standard deviation for the queue time for tasks waiting to be processed by a dispatcher.
Shown as nanosecond
lightbend.dispatchers.parallelism
(gauge)
Parallelism setting for a fork/join thread pool.
lightbend.dispatchers.pool_size
(gauge)
Current size of a thread pool.
lightbend.dispatchers.active_threads
(gauge)
Estimate of the number of active threads in a thread pool.
Shown as thread
lightbend.dispatchers.running_threads
(gauge)
Estimate of the number of running threads (not blocked) in a fork/join thread pool.
Shown as thread
lightbend.dispatchers.queued_tasks
(gauge)
Estimate of the number of queued tasks in a fork/join thread pool.
Shown as task
lightbend.actors.remote_sent_messages.mean_rate
(gauge)
Average rate of remote messages sent.
Shown as message
lightbend.actors.remote_sent_messages.min1_rate
(gauge)
1 minute rate of remote messages sent.
Shown as message
lightbend.actors.remote_sent_messages.min15_rate
(gauge)
15 minute rate of remote messages sent.
Shown as message
lightbend.actors.remote_sent_messages.min5_rate
(gauge)
5 minute rate of remote messages sent.
Shown as message
lightbend.actors.remote_sent_messages.samples
(gauge)
Total number of remote messages sent.
Shown as message
lightbend.actors.remote_received_messages.mean_rate
(gauge)
Average rate of remote messages received.
Shown as message
lightbend.actors.remote_received_messages.min1_rate
(gauge)
1 minute rate of remote messages received.
Shown as message
lightbend.actors.remote_received_messages.min15_rate
(gauge)
15 minute rate of remote messages received.
Shown as message
lightbend.actors.remote_received_messages.min5_rate
(gauge)
5 minute rate of remote messages received.
Shown as message
lightbend.actors.remote_received_messages.samples
(gauge)
Total number of remote messages received.
Shown as message
lightbend.actors.remote_sent_message_size.max
(gauge)
Maximum size of remote messages sent.
Shown as byte
lightbend.actors.remote_sent_message_size.mean
(gauge)
Average size of remote messages sent.
Shown as byte
lightbend.actors.remote_sent_message_size.median
(gauge)
Median size of remote messages sent.
Shown as byte
lightbend.actors.remote_sent_message_size.min
(gauge)
Minimum size of remote messages sent.
Shown as byte
lightbend.actors.remote_sent_message_size.p75
(gauge)
75th percentile size of remote messages sent.
Shown as byte
lightbend.actors.remote_sent_message_size.p95
(gauge)
95th percentile size of remote messages sent.
Shown as byte
lightbend.actors.remote_sent_message_size.p98
(gauge)
98th percentile size of remote messages sent.
Shown as byte
lightbend.actors.remote_sent_message_size.p99
(gauge)
99th percentile size of remote messages sent.
Shown as byte
lightbend.actors.remote_sent_message_size.p999
(gauge)
99.9th percentile size of remote messages sent.
Shown as byte
lightbend.actors.remote_sent_message_size.stddev
(gauge)
Standard deviation for the size of remote messages sent.
Shown as byte
lightbend.actors.remote_received_message_size.max
(gauge)
Maximum size of remote messages received.
Shown as byte
lightbend.actors.remote_received_message_size.mean
(gauge)
Average size of remote messages received.
Shown as byte
lightbend.actors.remote_received_message_size.median
(gauge)
Median size of remote messages received.
Shown as byte
lightbend.actors.remote_received_message_size.min
(gauge)
Minimum size of remote messages received.
Shown as byte
lightbend.actors.remote_received_message_size.p75
(gauge)
75th percentile size of remote messages received.
Shown as byte
lightbend.actors.remote_received_message_size.p95
(gauge)
95th percentile size of remote messages received.
Shown as byte
lightbend.actors.remote_received_message_size.p98
(gauge)
98th percentile size of remote messages received.
Shown as byte
lightbend.actors.remote_received_message_size.p99
(gauge)
99th percentile size of remote messages received.
Shown as byte
lightbend.actors.remote_received_message_size.p999
(gauge)
99.9th percentile size of remote messages received.
Shown as byte
lightbend.actors.remote_received_message_size.stddev
(gauge)
Standard deviation for the size of remote messages received.
Shown as byte
lightbend.actors.remote_serialization_time.max
(gauge)
Maximum time for serialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_serialization_time.mean
(gauge)
Average time for serialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_serialization_time.median
(gauge)
Median time for serialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_serialization_time.min
(gauge)
Minimum time for serialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_serialization_time.p75
(gauge)
75th percentile time for serialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_serialization_time.p95
(gauge)
95th percentile time for serialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_serialization_time.p98
(gauge)
98th percentile time for serialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_serialization_time.p99
(gauge)
99th percentile time for serialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_serialization_time.p999
(gauge)
99.9th percentile time for serialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_serialization_time.stddev
(gauge)
Standard deviation for the time for serialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_deserialization_time.max
(gauge)
Maximum time for deserialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_deserialization_time.mean
(gauge)
Average time for deserialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_deserialization_time.median
(gauge)
Median time for deserialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_deserialization_time.min
(gauge)
Minimum time for deserialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_deserialization_time.p75
(gauge)
75th percentile time for deserialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_deserialization_time.p95
(gauge)
95th percentile time for deserialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_deserialization_time.p98
(gauge)
98th percentile time for deserialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_deserialization_time.p99
(gauge)
99th percentile time for deserialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_deserialization_time.p999
(gauge)
99.9th percentile time for deserialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_deserialization_time.stddev
(gauge)
Standard deviation for the time for deserialization of remote messages.
Shown as nanosecond
lightbend.actors.remote_large_message_sent.mean_rate
(gauge)
Average rate of threshold limit events for large remote messages sent.
Shown as event
lightbend.actors.remote_large_message_sent.min1_rate
(gauge)
1 minute rate of threshold limit events for large remote messages sent.
Shown as event
lightbend.actors.remote_large_message_sent.min15_rate
(gauge)
15 minute rate of threshold limit events for large remote messages sent.
Shown as event
lightbend.actors.remote_large_message_sent.min5_rate
(gauge)
5 minute rate of threshold limit events for large remote messages sent.
Shown as event
lightbend.actors.remote_large_message_sent.samples
(gauge)
Total number of threshold limit events for large remote messages sent.
Shown as event
lightbend.actors.remote_large_message_received.mean_rate
(gauge)
Average rate of threshold limit events for large remote messages received.
Shown as event
lightbend.actors.remote_large_message_received.min1_rate
(gauge)
1 minute rate of threshold limit events for large remote messages received.
Shown as event
lightbend.actors.remote_large_message_received.min15_rate
(gauge)
15 minute rate of threshold limit events for large remote messages received.
Shown as event
lightbend.actors.remote_large_message_received.min5_rate
(gauge)
5 minute rate of threshold limit events for large remote messages received.
Shown as event
lightbend.actors.remote_large_message_received.samples
(gauge)
Total number of threshold limit events for large remote messages received.
Shown as event
lightbend.remote_nodes.cluster_domain_event.mean_rate
(gauge)
Average rate of Akka cluster domain events.
Shown as event
lightbend.remote_nodes.cluster_domain_event.min1_rate
(gauge)
1 minute rate of Akka cluster domain events.
Shown as event
lightbend.remote_nodes.cluster_domain_event.min15_rate
(gauge)
15 minute rate of Akka cluster domain events.
Shown as event
lightbend.remote_nodes.cluster_domain_event.min5_rate
(gauge)
5 minute rate of Akka cluster domain events.
Shown as event
lightbend.remote_nodes.cluster_domain_event.samples
(gauge)
Total number of Akka cluster domain events.
Shown as event
lightbend.remote_nodes.cluster_member_event.mean_rate
(gauge)
Average rate of Akka cluster member events.
Shown as event
lightbend.remote_nodes.cluster_member_event.min1_rate
(gauge)
1 minute rate of Akka cluster member events.
Shown as event
lightbend.remote_nodes.cluster_member_event.min15_rate
(gauge)
15 minute rate of Akka cluster member events.
Shown as event
lightbend.remote_nodes.cluster_member_event.min5_rate
(gauge)
5 minute rate of Akka cluster member events.
Shown as event
lightbend.remote_nodes.cluster_member_event.samples
(gauge)
Total number of Akka cluster member events.
Shown as event
lightbend.remote_nodes.node_quarantined_event.mean_rate
(gauge)
Average rate of Akka remote node quarantined events.
Shown as event
lightbend.remote_nodes.node_quarantined_event.min1_rate
(gauge)
1 minute rate of Akka remote node quarantined events.
Shown as event
lightbend.remote_nodes.node_quarantined_event.min15_rate
(gauge)
15 minute rate of Akka remote node quarantined events.
Shown as event
lightbend.remote_nodes.node_quarantined_event.min5_rate
(gauge)
5 minute rate of Akka remote node quarantined events.
Shown as event
lightbend.remote_nodes.node_quarantined_event.samples
(gauge)
Total number of Akka remote node quarantined events.
Shown as event
lightbend.remote_nodes.phi_accrual_value
(gauge)
Current phi accrual value for Akka remote node failure detection.
lightbend.self_nodes.phi_accrual_threshold_value
(gauge)
Current phi accrual threshold value for Akka remote node failure detection.

Events

The Lightbend Reactive Platform integration does not include any events.

Service Checks

The Lightbend Reactive Platform integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers