OCI Compute

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

Oracle Cloud Infrastructure (OCI) provides flexible, high-performance, and secure compute for any workload—including AI and machine learning (ML), compute-intensive, enterprise, and cloud-native applications.

This integration lets you monitor and alert on the health, capacity, throughput, status, and performance of your Virtual Machines and Bare metal instances.

It collects metrics and tags from the following Compute namespaces:

Setup

Installation

After you set up the Oracle Cloud Infrastructure integration, ensure that the oci_computeagent, oci_rdma_infrastructure_health, and oci_compute_infrastructure_health namespaces are included in your Connector Hub.

Data Collected

Metrics

oci.computeagent.cpu_utilization
(gauge)
Activity level from CPU. Expressed as a percentage of total time. For instance pools, the value is averaged across all instances in the pool.
Shown as percent
oci.computeagent.disk_bytes_read
(count)
Read throughput. Expressed as bytes read per interval.
Shown as byte
oci.computeagent.disk_bytes_written
(count)
Write throughput. Expressed as bytes written per interval.
Shown as byte
oci.computeagent.disk_iops_read
(count)
Activity level from I/O reads. Expressed as reads per interval.
Shown as operation
oci.computeagent.disk_iops_written
(count)
Activity level from I/O writes. Expressed as writes per interval.
Shown as operation
oci.computeagent.load_average
(gauge)
Average system load calculated over a 1-minute period.
Shown as process
oci.computeagent.memory_allocation_stalls
(count)
Number of times page reclaim was called directly.
oci.computeagent.memory_utilization
(gauge)
Space currently in use. Measured by pages. Expressed as a percentage of used pages. For instance pools, the value is averaged across all instances in the pool.
Shown as percent
oci.computeagent.networks_bytes_in
(count)
Network receipt throughput. Expressed as bytes received.
Shown as byte
oci.computeagent.networks_bytes_out
(count)
Network transmission throughput. Expressed as bytes transmitted.
Shown as byte
oci.rdma_infrastructure_health.rdma_rx_bytes
(count)
The bytes received on the RDMA interface.
Shown as byte
oci.rdma_infrastructure_health.rdma_rx_packets
(count)
The number of RDMA interface packets received.
Shown as packet
oci.rdma_infrastructure_health.rdma_tx_bytes
(count)
The bytes transmitted on the RDMA interface.
Shown as byte
oci.rdma_infrastructure_health.rdma_tx_packets
(count)
The number of RDMA interface packets transmitted.
Shown as packet
oci.compute_infrastructure_health.health_status
(count)
The number of health issues for an instance. Any non-zero value indicates a health defect. This metric is available only for bare metal instances.
Shown as error
oci.compute_infrastructure_health.instance_status
(gauge)
The status of a running instance. A value of 0 indicates that the instance is available (up). A value of 1 indicates that the instance is not available (down) due to an infrastructure issue. If the instance is stopped, then the metric does not have a value. This metric is available only for VM instances.
Shown as instance
oci.compute_infrastructure_health.maintenance_status
(gauge)
The maintenance status of an instance. A value of 0 indicates that the instance is not scheduled for an infrastructure maintenance event. A value of 1 indicates that the instance is scheduled for an infrastructure maintenance event. This metric is available for both VM and bare metal instances.
Shown as instance

Events

The OCI Compute integration does not include any events.

Service Checks

The OCI Compute integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers