PacketFabric

Supported OS Linux Windows Mac OS

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

PacketFabric is a global Network as a Service (NaaS) provider that offers secure, private, and on-demand connectivity services.

You can use PacketFabric to quickly and easily build a robust network between cloud platforms, SaaS providers, and hundreds of colocation centers around the world.

With this integration, you can leverage Datadog to monitor your PacketFabric network traffic data, for example

  • Traffic rate metrics for physical interfaces
  • Traffic rate metrics for logical interfaces

metrics dashboard

Setup

Installation

  1. Go to the PacketFabric integration in Datadog.
  2. Click Install Integration.
  3. On the Configure tab, click Connect Accounts.
  4. You are redirected to the PacketFabric login page. Enter your credentials to log in.
  5. You are shown a page requesting Datadog permissions. Click Authorize.

Once authorized, the metrics will be sent from PacketFabric to Datadog every 15 minutes as part of a scheduled task.

Uninstallation

Once this integration has been uninstalled, any previous authorizations are revoked.

Additionally, ensure that all API keys associated with this integration have been disabled by searching for the integration name on the API Keys page.

Data Collected

Metrics

See metadata.csv for a list of metrics provided by this integration.

Support

Need help? Contact PacketFabric Support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers