SSH

Supported OS Linux Windows Mac OS

통합 버전4.2.1
이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

This check lets you monitor SSH connectivity to remote hosts and SFTP response times.

Setup

Installation

The SSH/SFTP check is included in the Datadog Agent package. No additional installation is needed on your server.

Configuration

Host

To configure this check for an Agent running on a host:

  1. Edit the ssh_check.d/conf.yaml file in the conf.d/ folder at the root of your Agent’s configuration directory. See the sample ssh_check.d/conf.yaml for all available configuration options:

    init_config:
    
    instances:
      - host: "<SOME_REMOTE_HOST>" # required
        username: "<SOME_USERNAME>" # required
        password: "<SOME_PASSWORD>" # or use private_key_file
        # private_key_file: <PATH_TO_PRIVATE_KEY>
        # private_key_type:         # rsa or ecdsa; default is rsa
        # port: 22                  # default is port 22
        # sftp_check: False         # set False to disable SFTP check; default is True
        # add_missing_keys: True    # default is False
    
  2. Restart the Agent to start sending SSH/SFTP metrics and service checks to Datadog.

Containerized

For containerized environments, see the Autodiscovery Integration Templates for guidance on applying the parameters below.

ParameterValue
<INTEGRATION_NAME>ssh_check
<INIT_CONFIG>blank or {}
<INSTANCE_CONFIG>{"host": "%%host%%", "port":"22", "username":"<USERNAME>"}

Validation

Run the Agent’s status subcommand and look for ssh_check under the Checks section.

Data Collected

Metrics

sftp.response_time
(gauge)
The response time of SFTP
Shown as second

Events

The SSH Check does not include any events.

Service Checks

ssh.can_connect
Returns CRITICAL if the Agent check is unable to connect to the SSH host. Returns OK otherwise.
Statuses: ok, critical

sftp.can_connect
Returns CRITICAL if the Agent check is unable to connect to the SFTP host. Returns OK otherwise.
Statuses: ok, critical

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers