TLS

Supported OS Linux Windows Mac OS

통합 버전4.4.0
이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

This check monitors TLS protocol versions, certificate expiration and validity, etc.

Notes:

  1. Only TCP is supported.
  2. Only leaf / end user certificates are verified (not intermediate and root certificates).

Setup

Installation

The TLS check is included in the Datadog Agent package. No additional installation is needed on your server.

Configuration

Host

To configure this check for an Agent running on a host:

  1. Edit the tls.d/conf.yaml file, in the conf.d/ folder at the root of your Agent’s configuration directory to start collecting your TLS data. See the sample tls.d/conf.yaml for all available configuration options.

  2. Restart the Agent.

Containerized

For containerized environments, see the Autodiscovery Integration Templates for guidance on applying the parameters below.

ParameterValue
<INTEGRATION_NAME>tls
<INIT_CONFIG>blank or {}
<INSTANCE_CONFIG>{"server": "%%host%%", "port":"443"}

Note: If you are using internal certificates that are not from a well-known, trusted CA, certain metrics may not report to Datadog. Use tls_verify: false in your integration template to report all metrics in this instance.

Validation

Run the Agent’s status subcommand and look for tls under the Checks section.

Data Collected

Metrics

tls.days_left
(gauge)
Days until X.509 certificate expiration
Shown as day
tls.issued_days
(count)
Day duration of timespan certificate is issued for
Shown as day
tls.issued_seconds
(count)
Second duration of timespan certificate is issued for
Shown as second
tls.seconds_left
(gauge)
Seconds until X.509 certificate expiration
Shown as second

Events

TLS does not include any events.

Service Checks

tls.can_connect
Returns CRITICAL if the Agent is unable to connect to the monitored endpoint, otherwise returns OK.
Statuses: ok, critical

tls.version
Returns CRITICAL if a connection is made with a protocol version that is not allowed, otherwise returns OK.
Statuses: ok, critical

tls.cert_validation
Returns CRITICAL if the certificate is malformed or does not match the server hostname, otherwise returns OK.
Statuses: ok, critical

tls.cert_expiration
Returns CRITICAL if the certificate has expired or expires in less than days_critical/seconds_critical, returns WARNING if the certificate expires in less than days_warning/seconds_warning, otherwise returns OK.
Statuses: ok, warning, critical

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers