Uptime.com

Supported OS Linux Windows Mac OS

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

Uptime.com is a comprehensive website monitoring service that provides real-time alerts and detailed performance analytics for your web applications and APIs.

The Uptime.com integration with Datadog enhances your monitoring capabilities by combining Uptime.com’s monitoring with Datadog’s platform. Key functionality includes:

  • Uptime.com alerts automatically generate corresponding events in Datadog.
  • Datadog events can be assigned lower priority and commented on for tracking.
  • Check response times are tracked as metrics in Datadog.
  • Metrics update every 5 minutes with 5 data points from 1-minute interval checks.

This integration enables you to proactively identify and resolve performance issues, minimizing downtime and improving overall site reliability.

Uptime.com Graph

Setup

Configuration

To activate the Datadog integration within your Uptime account, go to Notifications > Integrations then choose Datadog as the provider type when adding a new push notifications profile.

The following describes the fields shown when configuring Datadog within your Uptime account: shell

  • Name: The reference name you desire to assign to your Datadog profile. It can assist you with organizing multiple provider profiles within your Uptime account.

  • API key: ${api_key}

  • Application Key:

After configuring your Datadog profile, assign the profile to a contact group located under Alerting > Contacts. The profile is assigned in the Push Notifications field within the contact group.

Data Collected

Metrics

uptime.response_time
(gauge)
The response time when running the check.
Shown as second

Events

The Uptime integration sends an event to your Datadog Event Stream when an alert happens or resolves.

Service Checks

The Uptime check does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers