VNS3

Supported OS Linux Windows Mac OS

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

Get system and network state information from your Cohesive Networks VNS3 controller.

  • Peering links Status Check:

    peering

  • Overlay Clients Status Check:

    clients

  • IPSec tunnels Status Check:

    ipsec

  • Overlay Link Status Check:

    links

  • Remote Support Status Check:

    remote_support

  • Interface Status Check:

    interface_status

Setup

Configuration

Deploy and configure the Cohesive Networks Datadog plugin according to the Datadog Agent Plugin Details documentation.

Data Collected

Metrics

vns3.ipsec
(gauge)
IPSec tunnel connection state
vns3.overlay.clients
(gauge)
Overlay client connection state
vns3.peering
(gauge)
VNS3 peer reachability state
vns3.interfaces
(gauge)
Interface up/down state
vns3.overlay.links
(gauge)
LNK connection state
vns3.sys_admin.remote_support
(gauge)
Remote Support enabled state

Netflow, log reporting, and SNMP polling are also supported.

Events

The VNS3 integration does not include any events.

Service Checks

The VNS3 integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support or Cohesive Networks support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers