이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

SD-WAN monitoring

Alongside SNMP devices, you can monitor wireless and software-defined wide area network (SD-WAN) environments for select vendors. Collect metrics from wireless access points, and monitor the health of SD-WAN tunnels and edge devices.

SD-WAN reference architecture

SD-WAN is a type of networking technology that uses software-defined networking (SDN) principles to manage and optimize the performance of wide area networks (WANs). It is often used to interconnect remote offices and data centers across different transports (MPLS, broadband, 5G, and so on). SD-WAN benefits from automatic load balancing and failure detection across these transports. For more information on Datadog’s SD-WAN observability capabilities, see the SD-WAN reference architecture.

Supported vendors

Datadog supports the following vendors for SD-WAN network monitoring:

Further Reading

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers