HTTP Server Source

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Use Observability Pipelines’ HTTP/S Server source to collect HTTP client logs. Select and set up this source when you set up a pipeline.

Prerequisites

To use Observability Pipelines’ HTTP/S Server source, you need the following information available:

  • The HTTP/S server address, such as 0.0.0.0:9997. The Observability Pipelines Worker listens to this socket address for your HTTP client logs.
  • The HTTP authentication password.

Set up the source in the pipeline UI

Select and set up this source when you set up a pipeline. The information below is for the source settings in the pipeline UI.

To configure your HTTP/S Server source, enter the following:

  1. Select your authorization strategy.
  2. Select the decoder you want to use on the HTTP messages. Your HTTP client logs must be in this format. Note: If you select bytes decoding, the raw log is stored in the message field.
  3. Optionally, toggle the switch to enable TLS. If you enable TLS, the following certificate and key files are required:
    • Server Certificate Path: The path to the certificate file that has been signed by your Certificate Authority (CA) Root File in DER or PEM (X.509).
    • CA Certificate Path: The path to the certificate file that is your Certificate Authority (CA) Root File in DER or PEM (X.509).
    • Private Key Path: The path to the .key private key file that belongs to your Server Certificate Path in DER or PEM (PKCS #8) format.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers