이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

W3C traces implicitly contain 128-bit trace IDs, rather than the 64-bit trace IDs that Datadog traces have historically used. The latest default configuration for Datadog tracing libraries uses the setting DD_TRACE_128_BIT_TRACEID_GENERATION_ENABLED=True so that Datadog also produces trace data with 128-bit trace IDs.

Following the W3C Trace Context recommendations, Datadog 128-bit trace IDs have randomness in the lower-order 64 bits. This restriction provides backward compatibility for systems that intermix libraries that generate 64-bit trace IDs with newer ones that support 128-bit IDs. In such systems, spans with the full 128-bit trace ID and spans with the truncated lower-order 64-bit trace ID can arrive at the backend and be treated as matching and part of the same trace.

128-bit Trace IDs can be passed with trace context to code whose tracing library generates 64-bit trace IDs, and Datadog successfully correlate them in the backend.

Further reading

추가 유용한 문서, 링크 및 기사:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers