이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.
Join the Preview!

Static Infrastructure as Code (IaC) scanning is in Preview. To request access, complete the form.

Request Access

Static Infrastructure as Code (IaC) scanning integrates with version control systems, such as GitHub, to detect misconfigurations in cloud resources defined by Terraform. The scanning results are displayed in two primary locations: within pull requests during code modifications and on the Findings page within Cloud Security.

Static IaC scanning supports GitHub for version control and Terraform for infrastructure as code.
Cloud Security Findings page displaying detected misconfigurations in cloud resources

When you click on a finding, the side panel reveals additional details, including a short description of the IaC rule related to the finding and a preview of the offending code.

Finding side panel highlighting undefined EBS volume encryption in Terraform code.

Further reading

추가 유용한 문서, 링크 및 기사:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers