이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Use the following instructions to enable Infrastructure as Code (IaC) remediation for Cloud Security. IaC remediation is available for Cloud Security Misconfigurations and Cloud Security Identity Risks.

Static IaC remediation supports GitHub for version control and Terraform for infrastructure as code.

Set up the GitHub integration

Follow the instructions for creating a GitHub app for your organization.

To use IaC remediation, you must give the Github App Read & Write permissions for Contents and Pull Requests. These permissions can be applied to all or select repositories.

Enable IaC remediation for your repositories

After you set up the GitHub integration, enable IaC remediation for the repositories in your GitHub account.

  1. On the Cloud Security Setup page, expand the Source Code Integrations section.
  2. Click Configure for the GitHub account you want to configure.
  3. To enable IaC:
    • All repositories: Toggle Enable Infrastructure as Code (IaC) Remediation to the on position.
    • Single repository: Toggle the IAC Remediation option for the specific repository to the on position.

Further reading

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers