이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: go-best-practices/check-len

Language: Go

Severity: Warning

Category: Best Practices

Description

In Go, the built-in len() function returns the length of a slice, map, or string, and it never produces a negative value. The length of any data structure in Go is always a non-negative integer.

Hence, the condition len(mySlice) < 0 will always evaluate to false, and the code block within the if statement will never execute.

To fix this issue, you should remove the unnecessary check for len(mySlice) < 0:

Non-Compliant Code Examples

func main() {
    if len(mySlice) < 0 {
        // never occurs
    }
}

Compliant Code Examples

func main() {
    if len(mySlice) == 0 {

    }
}
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers