이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: go-best-practices/negative-zero

Language: Go

Severity: Info

Category: Best Practices

Description

In Go, negative zero (-0 or -0.0) is considered the same as zero (0 or 0.0). This behavior is a result of how floating-point numbers are represented and handled in the Go language specification.

Floating-point numbers in Go follow the standards defined by the IEEE 754 floating-point arithmetic standard. According to this standard, there are two representations for zero: positive zero and negative zero. Both of these representations have the same magnitude but differ in sign. However, they are considered equal in terms of numerical value.

The Go language specification explicitly states that comparisons between floating-point numbers, including zero and negative zero, should follow the IEEE 754 standard. This means that comparing zero and negative zero with equality operators (==) will always result in true. For example, 0 == -0 and 0.0 == -0.0 both evaluate to true.

The reason for this behavior is to ensure consistency and to avoid unnecessary complexity when working with floating-point numbers. By treating zero and negative zero as equal, developers can focus on the numerical value itself without having to account for sign differences.

It’s important to note that this behavior is specific to floating-point numbers in Go. In other programming languages or contexts, negative zero may have different semantics or behaviors. Therefore, it’s always a good practice to consult the language specification or documentation to understand how zero and negative zero are handled in a specific programming language or environment.

Non-Compliant Code Examples

func main (){
    foo := -0.0
    foo := 0.0
    bar := float32(-0.0)
    baz := float64(-0.0)
    plopage := -float32(0)
    plopige := -float64(0)
    plopege := -float32(0.0)
    plopyge := -float64(0.0)
}

Compliant Code Examples

func main (){
    foo := 0.0
    foo := 0.0
    bar := float32(0.0)
    baz := float64(0.0)
    plopage := float32(0)
    plopige := float64(0)
    plopege := float32(0.0)
    plopyge := float64(0.0)
}
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers