이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: java-best-practices/forloop-variable-count

Language: Java

Severity: Warning

Category: Best Practices

Description

The presence of multiple control variables in a for loop can obscure the range of values over which the loop iterates and make your code brittle and difficult to debug.

To follow this rule, regular for loops should have only one control variable.

Arguments

  • max-variables: Maximum number of control variables. Default: 1.

Non-Compliant Code Examples

public class Main {
   public void foo() {
      for (int i = 0, j = 0; i < 10; i++, j += 2) { // more than one control variable
         foo();
      }
   }
}

Compliant Code Examples

public class Main {
   public void foo() {
      for (int i = 0; i < 10; i++) {
         foo();
      }
   }
}
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers