이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: java-security/unsafe-reflection

Language: Java

Severity: Error

Category: Security

CWE: 470

Description

Using reflection with class names being manually generated is unsafe and can lead to code injection. The class name must be validated and the program should make sure no malicious class can be loaded at runtime.

Non-Compliant Code Examples

class Test {
    void test() {
        String which = "org.owasp.benchmark.helpers." + props.getProperty("thing");
        System.out.println("foo");
        Class<?> thing = Class.forName(which);
        Constructor<?> thingConstructor = thing.getConstructor();
    }
}

Compliant Code Examples

class Test {
    void test() {
        String which = "org.owasp.benchmark.helpers.MyClass";
        System.out.println("foo");
        Class<?> thing = Class.forName(which);
        Constructor<?> thingConstructor = thing.getConstructor();
    }
}
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers