이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: javascript-best-practices/no-empty

Language: JavaScript

Severity: Error

Category: Best Practices

CWE: 670

Description

Empty or non-functional blocks in the code can be misleading and lead to maintenance difficulties. They can also lead to a false sense of security or functionality. While they may not directly introduce security issues, their presence can suggest that some logic or error handling is implemented when it is not.

Non-Compliant Code Examples

try {} catch (ex) {throw ex}
try { foo() } catch (ex) {}
try { foo() } catch (ex) {throw ex} finally {}
if (foo) {}
while (foo) {}
for (;foo;) {}
switch(foo) {}
switch (foo) { /* empty */ }
try {} catch (ex) {}
try { foo(); } catch (ex) {} finally {}
try {} catch (ex) {} finally {}
try { foo(); } catch (ex) {} finally {}
(function() { }())
var foo = () => {}
function foo() { }
function foo() { 
    
}

Compliant Code Examples

if (foo) { bar() }
while (foo) { bar() }
for (;foo;) { bar() }
try { foo() } catch (ex) { foo() }
switch(foo) {case 'foo': break;}
if (foo) {/* empty */}
while (foo) {/* empty */}
for (;foo;) {/* empty */}
try { foo() } catch (ex) {/* empty */}
try { foo() } catch (ex) {// empty
}
try { foo() } finally {// empty
}
try { foo() } finally {// test
}
try { foo() } finally {
    
    // hi i am off no use
}
try { foo() } catch (ex) {/* test111 */}
if (foo) { bar() } else { // nothing in me 
}
if (foo) { bar() } else { /**/
}
if (foo) { bar() } else { //
}
function foo() { 
  const test = {};  
}
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers