이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: php-security/ldap-authenticate-connection

Language: PHP

Severity: Error

Category: Security

CWE: 521

Description

Lightweight Directory Access Protocol (LDAP) is a protocol used for accessing and maintaining distributed directory information services over a network. It’s often used for user authentication and authorization, among other things.

Unauthenticated LDAP connections can pose a significant security risk. Without proper authentication, sensitive data can be exposed to unauthorized users, and the system could be vulnerable to malicious attacks.

To avoid violating this rule, always provide authentication credentials when binding to an LDAP server using the ldap_bind() function in PHP. This function takes three parameters: the LDAP link identifier, the bind RDN (username), and the bind password. Providing the username and password ensures that the LDAP connection is authenticated. So, instead of ldap_bind($ldap), use ldap_bind($ldap, $username, $password) to securely connect to the LDAP server.

Non-Compliant Code Examples

<?php
$ldap = ldap_connect("ldap.example.com");
$ldapbind = ldap_bind($ldap); // Insecure: no authentication provided

Compliant Code Examples

<?php
$username = "username";
$password = "password";
$ldap = ldap_connect("ldap.example.com");
$ldapbind = ldap_bind($ldap, $username, $password); // Secure: authentication provided
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers