이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: python-best-practices/init-call-parent

Language: Python

Severity: Warning

Category: Best Practices

Description

Calling the parent constructor should be done by calling super(), not by calling the parent object directly.

Non-Compliant Code Examples

class Class(Parent):
    def __init__(self):
        SomeClass.__init__(self)  # should use super()

Compliant Code Examples

# More than one parent, we need to know exactly what
# parent constructor to use
class DummyCIVisibilityWriter(DummyWriterMixin, CIVisibilityWriter):
    def __init__(self, *args, **kwargs):
        CIVisibilityWriter.__init__(self, *args, **kwargs)
        DummyWriterMixin.__init__(self, *args, **kwargs)
        self._encoded = None
class Class(Parent):
    def foo(self):
        SomeClass.__init__(self)  # outside of __init__, valid
class Class(Parent):
    def __init__(self):
        super().__init__(self)
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers