이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: python-best-practices/no-equal-unary

Language: Python

Severity: Error

Category: Best Practices

Description

Operator =+ and =- do not exist in Python. The code is valid but is unlikely doing what the developer wants to achieve.

Non-Compliant Code Examples

# =+ does not exists in Python, use n = n + 3
n =+ 3

# =- does not exists in Python, use n = n - 3
n =- 3

Compliant Code Examples

n = n + 3

n = n - 3

foo = -1
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers