이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: python-best-practices/static-method-no-self

Language: Python

Severity: Error

Category: Best Practices

Description

A static method makes no use of an instance. Therefore, the self argument is not needed nor useful and should not be used.

Non-Compliant Code Examples

class Foo:
  @staticmethod
  def foo(self, bar):  # no need to use the self argument with a @staticmethod
     pass

Compliant Code Examples

class Foo:
  @staticmethod
  def foo(bar):
     pass
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers