이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: python-inclusive/variable-name

Language: Python

Severity: Notice

Category: Code Style

Description

Check the variable names and suggest better names.

Examples of replacement suggestions:

  • blacklist with denylist
  • whitelist with allowlist
  • master with primary
  • slave with secondary

Non-Compliant Code Examples

# banned name, will suggest allowlist
whitelist = "foo"
names_whitelist = "bla";

names_blacklist = "bla";

addr_master_ip = "5.4.3.8";
addr_slave_ip = "1.2.3.4";

Compliant Code Examples

# not a problem with the name
snow_white = "happy"
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers