이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: python-security/insecure-ssl-protocols

Language: Python

Severity: Notice

Category: Security

Description

The following security protocols should never be used in Python: SSLv3, SSLv2, TLSv1. For more details, read the SSL module page of the official documentation.

The issue addresses the CWE-757 - selection of less-secure algorithm during negotiation.

Non-Compliant Code Examples

import ssl

def newconnect(self):
  try:
    s = socket.socket(socket.AF_INET, socket.SOCK_STREAM)
    remote = ssl.wrap_socket(s,
                             ca_certs= CA,
                             cert_reqs=ssl.CERT_REQUIRED,
                             ssl_version = ssl.PROTOCOL_SSLv3)
    remote.connect(self.server.seradd)
    if not self.server.seradd[0] == remote.getpeercert()['subjectAltName'][0][1]:
      logging.error('Server crt error !! Server Name don\'t mach !!')
      logging.error(remote.getpeercert()['subjectAltName'][0][1])
      return
    if not self.send_PW(remote):
      logging.warn('PW error !')
      return
    except socket.error, e:
      logging.warn(e)
      return

Compliant Code Examples

import ssl

def newconnect(self):
  try:
    s = socket.socket(socket.AF_INET, socket.SOCK_STREAM)
    remote = ssl.wrap_socket(s,
                             ca_certs= CA,
                             cert_reqs=ssl.CERT_REQUIRED,
                             ssl_version = ssl.PROTOCOL_TLS)
    remote.connect(self.server.seradd)
    if not self.server.seradd[0] == remote.getpeercert()['subjectAltName'][0][1]:
      logging.error('Server crt error !! Server Name don\'t mach !!')
      logging.error(remote.getpeercert()['subjectAltName'][0][1])
      return
    if not self.send_PW(remote):
      logging.warn('PW error !')
      return
    except socket.error, e:
      logging.warn(e)
      return
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers