이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: python-security/request-verify

Language: Python

Severity: Error

Category: Security

Description

The verify parameter controls whether the SSL certificate should be verified during your server requests. It’s strongly recommended to set this parameter to True which is the default value. This rule will warn you when it’s detected False has been set.

Non-Compliant Code Examples

import requests

def fetch_data():
    r = requests.get(w, verify=False, timeout=5)
from requests import get
r = get(w, verify=False)  # verify should be True
r = get(w, verify=False, timeout=10)  # verify should be True

Compliant Code Examples

from requests import get
r = get(w)
r = get(w, timeout=10, verify=True)
from requests import get
r = get(w)
r = get(w, timeout=10)
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers