이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Metadata

ID: ruby-security/yaml-load

Language: Ruby

Severity: Warning

Category: Security

CWE: 502

Description

This rule is designed to prevent the use of YAML functions in Ruby code. YAML functions such as YAML.load and YAML.load_file can be potentially dangerous as they have the ability to deserialize arbitrary objects, which can lead to code execution vulnerabilities if the input is not trusted.

Adhering to this rule is important to ensure the security of the application. When untrusted data is deserialized, it can lead to a variety of security exploits, including Remote Code Execution (RCE), which can provide an attacker with complete control over the application.

To avoid this, use safer methods such as Psych.safe_load or YAML.safe_load instead. These methods only allow the deserialization of simple, safe types. Additionally, always ensure that the data being deserialized is from a trusted source. By following these good coding practices, you can maintain the security and integrity of your Ruby application.

Non-Compliant Code Examples

YAML.load(data)
YAML.load_file(filename)

Compliant Code Examples

Psych.safe_load('--- foo')
YAML.load("something")
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers