Impossible travel event observed from 1Password user

Set up the 1password integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect an Impossible Travel event from a 1Password user.

Strategy

The Impossible Travel detection type’s algorithm compares the GeoIP data of the last log and the current log to determine if the user (@usr.email) traveled more than 500km at over 1,000km/h.

Triage and response

  1. Determine if {{@usr.email}} should be connecting from {{@impossible_travel.triggering_locations.first_location.city}},{{@impossible_travel.triggering_locations.first_location.country}} and {{@impossible_travel.triggering_locations.second_location.city}}, {{@impossible_travel.triggering_locations.second_location.country}} in a short period of time.
  2. If the user should not be connecting from {{@impossible_travel.triggering_locations.first_location.city}}, {{@impossible_travel.triggering_locations.first_location.country}} or {{@impossible_travel.triggering_locations.second_location.city}}, {{@impossible_travel.triggering_locations.second_location.country}}, then consider isolating the account and resetting their credentials.
  3. Use the Cloud SIEM - User Investigation dashboard to audit any user actions that may have occurred after the illegitimate login.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers