Attempt to modify a 1Password item by user

Set up the 1password integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when a 1Password user attempts to modify an item.

Strategy

This rule monitors 1Password audit logs to determine when the the enter-item-edit-mode item usage action occurs. This could indicate an attempt to modify an item.

Triage & response

  1. Investigate the {{@usr.email}} attempting to modify item {{@item_uuid}} within vault {{@vault_uuid}}.
  2. If this action was unintend by the user:
    • Rotate the user’s 1Password master password
    • Identify all the items that were modified and rotate the necessary authentication credentials
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers