1Password vault export attempt by user

Set up the 1password integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect possible exfiltration attempts from 1Password through a vault export.

Strategy

This rule monitors 1Password audit logs to determine when the export item usage action occurs on a vault. This could indicate exfiltration attempts from 1Password by downloading or exporting items within a vault.

Triage & response

  1. Investigate the {{@usr.email}} attempting to download or export vault {{@vault_uuid}}.
  2. If this action was unintended by the user:
    • Rotate the user’s 1Password master password
    • Identify all the items within the vault that were exported and rotate the necessary authentication credentials
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers