CloudFront distributions should be configured for origin failover

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This assessment verifies if an Amazon CloudFront distribution has been set up with an origin grouping that contains at least two origins.

Using CloudFront origin failover has the potential to enhance system reliability. In the event that the primary origin is inaccessible or returns certain HTTP response status codes, origin failover automatically redirects traffic to a secondary origin.

Remediation

For instructions on setting up origin failover for a CloudFront distribution, refer to Creating an origin group in the Amazon CloudFront Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers