DocumentDB clusters should have deletion protection enabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This feature verifies if deletion protection is active on an Amazon DocumentDB cluster. The feature will not pass if deletion protection is not enabled.

Deletion protection provides an extra level of security to prevent accidental deletion of databases or unauthorized deletions. A cluster with deletion protection enabled cannot be deleted. Prior to deleting a cluster, deletion protection must be disabled. Deletion protection is automatically enabled when creating a cluster in the Amazon DocumentDB console.

Remediation

To activate deletion protection for an already existing Amazon DocumentDB cluster, refer to the section on modifying a cluster in the Amazon DocumentDB Developer Guide. In the Modify Cluster section, select the option to enable deletion protection.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers