DocumentDB clusters should publish audit logs to CloudWatch Logs

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control verifies if an Amazon DocumentDB cluster is configured to send audit logs to Amazon CloudWatch Logs. The control is marked as failed if the cluster does not transmit audit logs to CloudWatch Logs.

Amazon DocumentDB (compatible with MongoDB) enables you to track activities performed within your cluster, such as successful and unsuccessful attempts to authenticate, the removal of a collection in a database, or the creation of an index. Auditing is not enabled by default in Amazon DocumentDB, and you must manually activate it.

Remediation

To publish Amazon DocumentDB audit logs to CloudWatch Logs, see Enabling auditing in the Amazon DocumentDB Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers