EC2 Client VPN endpoints should have client connection logging enabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control verifies if client connection logging is enabled for an AWS Client VPN endpoint. AWS Client VPN endpoints facilitate secure connections between remote clients and resources within a Virtual Private Cloud (VPC). Enabling connection logging enhances visibility by allowing you to monitor user activity on the VPN endpoint. When connection logging is activated, you can assign a log stream name within a log group, or if none is specified, the Client VPN service automatically generates one.

Remediation

For instructions on configuring logging, refer to the Enable connection logging for an existing Client VPN endpoint section of the AWS Client VPN Administrator Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers