EC2 instances should be managed by SSM

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control verifies that running EC2 instances are managed by AWS Systems Manager (SSM). SSM is a service designed to monitor, manage and patch your AWS infrastructure.

EC2 instances should be managed by SSM to enhance security, ensure compliance, and streamline management. SSM enables centralized control, automated monitoring, and remediation of policy violations, while simplifying configuration and maintenance of instances.

Remediation

For guidance on managing EC2 instances with SSM, refer to the Amazon EC2 host management section of the AWS Systems Manager User Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers