An EKS Cluster's kubelet configuration file should have permissions set to 644 or more restrictive

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

If the kubelet refers to a configuration file with the --config argument, ensure that the file has permissions set to 644 or to a more restrictive setting. If a file is specified, you should restrict its file permissions to maintain the integrity of the file. The file should be writable only by the administrators on the system.

Remediation

Run the following command to fix the kubelet configuration file’s permissions:

chmod 644 /etc/kubernetes/kubelet/kubelet-config.json

Note: The path above is the default location in EKS.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers