Timeouts for streaming connections in an EKS worker node should be enabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Timeouts on streaming connections should be enabled. Setting idle timeouts ensures that the node is protected against Denial-of-Service attacks, inactive connections, and running out of ephemeral ports.

Remediation

Choose a remediation method from below. For both steps, a restart of the Kubelet service is required.

Kubelet config file

  1. Add the json below to this file: /etc/kubernetes/kubelet/kubelet-config.json
"streamingConnectionIdleTimeout": "4h0m0s"

Executable arguments

  1. Edit the Kubelet service file on each worker node and ensure the below parameters are part of the KUBELET_ARGS variable string.
--streaming-connection-idle-timeout=4h0m0s
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers