Elasticsearch domains should have audit logs enabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control confirms that audit logging is enabled for Elasticsearch domains. Audit logs allow extensive customization, enabling the monitoring of user activities in Elasticsearch clusters. This includes tracking both successful and failed authentication attempts, OpenSearch requests, index modifications, and incoming search queries. This check only verifies that audit logging is enabled, and does not require specific parameters.

Remediation

For detailed instructions on enabling audit logging, see Enabling audit logs in the Amazon OpenSearch Service Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers