Classic Load Balancers should be configured to use Connection Draining

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control verifies connection draining is enabled for Classic Load Balancers. Enabling connection draining ensures that the load balancer stops routing new requests to instances that are being de-registered or identified as unhealthy, while still allowing existing connections to complete. This feature is especially beneficial for instances within Auto Scaling groups, as it helps prevent abrupt disconnection of active sessions.

Remediation

To enable connection draining on Classic Load Balancers, refer to Configure Connection Draining for Your Classic Load Balancer.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers