Neptune DB clusters should have deletion protection enabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control verifies whether a Neptune DB cluster has deletion protection activated.

Enabling deletion protection adds an extra safeguard to prevent accidental or unauthorized deletion of the database. When deletion protection is active, the Neptune DB cluster cannot be deleted. To proceed with deletion, you must first disable deletion protection.

Remediation

For guidance on enabling deletion protection, please refer to the Deleting a DB Instance in Amazon Neptune section of the Neptune User Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers