Unused Network Access Control Lists should be removed

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This check verifies if there are any unused network access control lists (ACLs).

It examines the configuration of the AWS::EC2::NetworkAcl resource and identifies the connections of the network ACL.

If the only connection is the VPC of the network ACL, the check fails.

If there are other connections listed, the check passes.

Remediation

Please refer to the Amazon VPC User Guide for guidance on removing an unused network ACL. Note that you cannot delete the default network ACL or an ACL that is linked to subnets.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers